Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CJ0232 lists a cost of ₱5.00M, 1.01% above its Approved Budget for the Contract of ₱4.95M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a late adjustment to the ABC that was not reflected in the records.

Public record entityConstruction of Drainage System, Barangay Pacpaco, San Manuel, Tarlac
LocationSAN MANUEL (TARLAC), TARLAC, Region IIIContract 24CJ0232
Amount₱5,000,000.00101.01% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Drainage System, Barangay Pacpaco, San Manuel, Tarlac24CJ0232100%June 24, 2024June 24, 2024—completedsumbong source

Start: February 16, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Tarlac District Engineering Office",
  "ratio": 1.0101010101010102,
  "abcPhp": 4950000,
  "threshold": 0.995,
  "contractId": "24CJ0232",
  "contractor": "HOR-VERT ENT",
  "contractCostPhp": 5000000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a late adjustment to the ABC that was not reflected in the records.