Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 21EA0085 lists a cost of ₱96.50M, 0.00% above its Approved Budget for the Contract of ₱96.50M. Under RA 9184, awards normally may not exceed the ABC. This small excess may be due to rounding or minor adjustments during contract finalization.

Public record entityConstruction of Flood Control Along Boac River, Brgy. Sawi, Boac, Marinduque
LocationMARINDUQUE, Region IV-BContract 21EA0085
Amount₱96,502,061.41100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Along Boac River, Brgy. Sawi, Boac, Marinduque21EA0085Flood control100%September 17, 2022September 16, 2022—completedsumbong source

Start: March 26, 2021 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Marinduque District Engineering Office",
  "ratio": 1.0000420880225496,
  "abcPhp": 96498000,
  "threshold": 0.995,
  "contractId": "21EA0085",
  "contractor": "SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP",
  "contractCostPhp": 96502061.41
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This small excess may be due to rounding or minor adjustments during contract finalization.