Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22NI0069 was awarded at 99.90% of its ABC. Across its 23 recorded contracts, HGG BUILDERS & SUPPLY was awarded at ≥99.5% of ABC 22 times (95.7%), versus 70.4% for flood-control contracts overall. Contractors may bid close to the ABC to remain competitive while maximizing their potential profit.

Public record entityRehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 -K1508+750
LocationCITY OF BISLIG (SURIGAO DEL SUR), SURIGAO DEL SUR, Region XIIIContract 22NI0069
Amount₱96,399,243.6999.90% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 -K1508+75022NI0069100%October 4, 2023September 15, 2023—completedsumbong source

Start: June 22, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Surigao del Sur 2nd District Engineering Office",
  "ratio": 0.9989558931606217,
  "abcPhp": 96500000,
  "threshold": 0.995,
  "contractId": "22NI0069",
  "contractor": "HGG BUILDERS & SUPPLY",
  "contractCostPhp": 96399243.69
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate