Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22NI0069 was awarded at 99.90% of its ABC. Across its 23 recorded contracts, HGG BUILDERS & SUPPLY was awarded at ≥99.5% of ABC 22 times (95.7%), versus 70.4% for flood-control contracts overall. Contractors may bid close to the ABC to remain competitive while maximizing their potential profit.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 -K1508+75022NI0069 | 100% | October 4, 2023 | September 15, 2023 | — | completedsumbong source |
Start: June 22, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Surigao del Sur 2nd District Engineering Office",
"ratio": 0.9989558931606217,
"abcPhp": 96500000,
"threshold": 0.995,
"contractId": "22NI0069",
"contractor": "HGG BUILDERS & SUPPLY",
"contractCostPhp": 96399243.69
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate