Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22GN0001 and 23GN0051 have near-identical descriptions about 743 m apart (funding years 2022, 2023; ₱49.00M, ₱80.09M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or extension of the first, but this is not labeled in the titles.

Public record entityConstruction of Flood Mitigation Structure along Bago River, Negros Occidental
LocationBAGO CITY (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VIContract 22GN0001
Amount₱48,999,243.30 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure along Bago River, Negros Occidental22GN0001Flood control100%September 3, 2022September 3, 2022—completedsumbong source

Start: February 10, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22GN0001",
  "fundingYear": 2022,
  "municipality": "BAGO CITY (NEGROS OCCIDENTAL)",
  "distanceMeters": 742.9726539867672,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately