Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 5 contracts awarded to NFH CONST & SUPPLY by the same office started within 16 days, each between β±42.5M and β±50M (just under the β±50M threshold), with 3 in the same municipality. These may be separate flood control projects in different barangays or along different rivers, which is common for such infrastructure programs.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Revetment (along Libmanan River) within Bicol River Basin, Brgy. Aslong, Libmanan, Camarines Sur22FE0042 | 100% | October 6, 2022 | October 6, 2022 | β | completedsumbong source |
Start: March 16, 2022 Β· Source fetched October 21, 2026
Rule Definition
β₯3 contracts within 120 days, each 85β100% of β±50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Camarines Sur 2nd District Engineering Office",
"contractId": "22FE0042",
"contractor": "NFH CONST & SUPPLY",
"windowDays": 120,
"clusterSize": 5,
"thresholdPhp": 50000000,
"contractCostPhp": 48015655.63,
"averageTitleSimilarity": 0.8790617942580291
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program