Low-Graded DPWH Contractor Winning DepEd/DOH Works
A contractor with a D or F record grade on this site won DepEd/DOH infrastructure awards.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: AGH CONSTRUCTION CORPORATION, which has a record grade of D on this site (a summary of public data on 23 DPWH projects, not a government blacklist), won 1 DepEd/DOH infrastructure award worth ₱2.45M. A low grade may reflect delays or issues on past projects, not necessarily current performance.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|
Rule Definition
Exact name match between the graded organisation and the PhilGEPS awardee. Grades summarise public DPWH project data.
Triggering Data & citations
AGH CONSTRUCTION CORPORATION, which has a DPWH record grade of D on this site (based on 23 DPWH projects), won 1 DEPED infrastructure awards worth ₱2,449,069.
{
"grade": "D",
"awards": [
{
"url": "/agency-awards/bdc28e5a-46c0-48e9-abfb-661c87de694b",
"title": "RENOVATION OF SCHOOL BUILDING OF BACLARAN ES-C",
"office": "DEPARTMENT OF EDUCATION - DIVISION OF CITY SCHOOLS, PARAÑAQU",
"awardId": "bdc28e5a-46c0-48e9-abfb-661c87de694b",
"awardee": "AGH CONSTRUCTION CORPORATION",
"amountPhp": 2449068.77,
"awardDate": "2021-08-26",
"referenceId": "2021-024",
"businessCategory": "Construction Projects"
}
],
"totalPhp": 2449068.77,
"gradeScore": 62.4,
"dpwhProjects": 23,
"contractorUrl": "/organizations/c84ca693-93dc-4012-bdcd-1e7b0194bc98"
}Source documents
Possible Innocent Explanations
- The record grade summarises public DPWH project data (delays, flags) and is not a disqualification; agencies may have had no blacklist basis to exclude the contractor.
- A low grade may reflect delays or issues on past projects, not necessarily current performance.