Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23HO0096 and 23HO0225 have near-identical descriptions about 4507 m apart (funding year 2023; ₱26.46M, ₱26.46M). Worth checking whether they cover the same works. It is possible these are two phases or segments of drainage works in the same barangay, but the titles do not specify this.

Public record entityConstruction of Drainage System along Barangay Tunga, Moalboal, Cebu
LocationMOALBOAL (CEBU), CEBU, Region VIIContract 23HO0096
Amount₱26,458,248.92 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Drainage System along Barangay Tunga, Moalboal, Cebu23HO0096100%November 24, 2023November 24, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 6, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23HO0096",
  "fundingYear": 2023,
  "municipality": "MOALBOAL (CEBU)",
  "distanceMeters": 4506.853103729165,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Cite this record

Love the Philippines. “Duplicate or Near-Duplicate Projects (C3): Construction of Drainage System along Barangay Tunga, Moalboal, Cebu.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/72b1b342-85cd-4255-a98f-a7a942a25526

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuMoalboalTunga
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault10.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)lowUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.