Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

Contractor Concentration (Flood Control)

A contractor holds a very large share of flood-control contract value in a district or province.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: F GURREA CONST INC received 28.5% (₱336.59M of ₱1.18B) of recorded flood-control contract value in Iloilo 3rd District Engineering Office across 20 contracts and 11 contractors, at or above the 25% share threshold (HHI 0.146). This may be due to the contractor's strong track record or specialization in flood-control projects in the area.

Public record entityF GURREA CONST INCOrganization record →
LocationIloilo 3rd District Engineering Office
Amount₱336,592,000.0028.5% of peer-group contract value in public records sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Flagged peer group: Iloilo 3rd District Engineering Office

Reported complete (DPWH): 4Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Barotac Viejo River Control, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo, Sta. 3 + 528.6 - Sta. 2 + 881.4421GH0035Flood control100%May 1, 2022September 28, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Control Structure, Barangay Barrido, Ajuy, Iloilo23GH0047Flood control100%March 21, 2024March 21, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Mitigation Structure, Barangay Natividad, Barotac Viejo, Iloilo23GH0049Flood control100%May 20, 2024May 20, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Flood Mitigation Structure, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo23GH0048Flood control100%May 20, 2024May 20, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Rule Definition

Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.

Triggering Data & citations

Contractor holds a large share of flood-control contract value in its district/province

{
  "hhi": 0.14634845203988606,
  "scope": "deo",
  "bucketKey": "deo:Iloilo 3rd District Engineering Office",
  "contractor": "F GURREA CONST INC",
  "thresholds": {
    "share": 0.25,
    "minContracts": 3,
    "minBucketContracts": 10
  },
  "bucketTotalPhp": 1182311509.99,
  "contractorShare": 0.28468977689547054,
  "contractorTotalPhp": 336592000,
  "contractorContracts": 4
}

Possible Innocent Explanations

  • This may be due to the contractor's strong track record or specialization in flood-control projects in the area.

Connected records

Where this contractor works

Contractor grade C5 storms reached its projects · typhoon modeAll contractors & gradesContractor patterns