Love the Philippines

Anomaly / indicator worth examining — not an accusation.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 24CC0055 and 24CC0039 have near-identical descriptions about 274 m apart (funding year 2024; ₱99.00M, ₱96.50M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or a different phase that was not labeled as such in the title.

Public record entityConstruction of Riverbank Protection Structure at Barangay Malis (Phase III), Guiguinto, Bulacan
LocationGUIGUINTO (BULACAN), BULACAN, Region IIIContract 24CC0055
Amount₱98,999,939.04 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Riverbank Protection Structure at Barangay Malis (Phase III), Guiguinto, Bulacan24CC0055100%November 2, 2024September 19, 2024—completedsumbong source

Start: February 7, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24CC0055",
  "fundingYear": 2024,
  "municipality": "GUIGUINTO (BULACAN)",
  "distanceMeters": 274.3436919856457,
  "titleSimilarity": 0.9535714285714285
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately