Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23AA0283 was awarded at 100.00% of its ABC. Across its 22 recorded contracts, BJMJB CONST & SUPPLY was awarded at ≥99.5% of ABC 21 times (95.5%), versus 70.4% for flood-control contracts overall. This may reflect highly competitive bidding or precise cost estimation.

Public record entityConstruction of Slope Protection, Purok I & Purok II, Barangay Pulangi, Bacarra, Ilocos Norte
LocationBACARRA (ILOCOS NORTE), ILOCOS NORTE, Region IContract 23AA0283
Amount₱4,899,866.03100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection, Purok I & Purok II, Barangay Pulangi, Bacarra, Ilocos Norte23AA0283100%August 15, 2023June 20, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 11, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Ilocos Norte 1st District Engineering Office",
  "ratio": 0.9999825937046248,
  "abcPhp": 4899951.32,
  "threshold": 0.995,
  "contractId": "23AA0283",
  "contractor": "BJMJB CONST & SUPPLY",
  "contractCostPhp": 4899866.03
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may reflect highly competitive bidding or precise cost estimation.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteBacarraPulangi
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault5.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →