Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 6 contracts awarded to RAMARPLUS INC FORMERLY RAMAR ENT by the same office started within 0 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 4 in the same municipality. It is possible that the municipality had several urgent flood control needs in different locations, leading to multiple contracts being awarded at once.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Pinanganuran River Flood Control Structure, Barangay Villa Petrona, Libon, Albay22FO0056Flood control | 100% | December 31, 2022 | December 15, 2022 | — | completedsumbong source |
Start: March 22, 2022 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Albay 3rd District Engineering Office",
"contractId": "22FO0056",
"contractor": "RAMARPLUS INC FORMERLY RAMAR ENT",
"windowDays": 120,
"clusterSize": 6,
"thresholdPhp": 50000000,
"contractCostPhp": 49000000,
"averageTitleSimilarity": 0.7727657825766012
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program