Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23A00132 was awarded at 99.96% of its ABC. Across its 14 recorded contracts, RODEKOM GEN CONST AND ENT was awarded at ≥99.5% of ABC 14 times (100.0%), versus 70.4% for flood-control contracts overall. Contractors may consistently bid near the ABC to remain competitive in tight bidding environments.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Aringay River, Barangay Magsaysay, Tubao, La Union23A00132Flood control | 100% | December 23, 2023 | November 13, 2023 | — | completedsumbong source |
Start: February 14, 2023 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "La Union 2nd District Engineering Office",
"ratio": 0.9996237767875646,
"abcPhp": 96500000,
"threshold": 0.995,
"contractId": "23A00132",
"contractor": "RODEKOM GEN CONST AND ENT",
"contractCostPhp": 96463694.46
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
