Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24A00456 was awarded at 100.00% of its ABC. Across its 16 recorded contracts, UNIVERSAL DE LEON CONST AND AGGREGATES was awarded at ≥99.5% of ABC 16 times (100.0%), versus 70.4% for flood-control contracts overall. Contractors may consistently bid near the ABC to maximize their chances of winning while staying within legal limits.

Public record entityConstruction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 1, Sison - Binalonan, Pangasinan
LocationSISON (PANGASINAN), PANGASINAN, Region IContract 24A00456
Amount₱48,249,872.89100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 1, Sison - Binalonan, Pangasinan24A00456Flood control100%October 23, 2024July 31, 2024—completedsumbong source

Start: May 3, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Pangasinan 3rd District Engineering Office",
  "ratio": 0.999997365595855,
  "abcPhp": 48250000,
  "threshold": 0.995,
  "contractId": "24A00456",
  "contractor": "UNIVERSAL DE LEON CONST AND AGGREGATES",
  "contractCostPhp": 48249872.89
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate