Contractor Concentration (Flood Control)
A contractor holds a very large share of flood-control contract value in a district or province.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: FFJJ CONST received 33.3% (₱335.58M of ₱1.01B) of recorded flood-control contract value in MAGUINDANAO DEL NORTE across 13 contracts and 8 contractors, at or above the 25% share threshold (HHI 0.199). This may be due to limited competition or the contractor's specialized expertise in the area.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Flagged peer group: MAGUINDANAO DEL NORTE
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Mitigation Structure along Matampay River, Poblacion 7, Cotabato City22M00103Flood control | 100% | May 1, 2024 | December 22, 2023 | — | completedsumbong source |
| Construction of Riverbank Protection (Revetment) along Tamontaka River, (Semba- Linek River Section- Phase II), Datu Odin Sinsuat, Maguindanao23M00096Flood control | 100% | May 4, 2024 | May 4, 2024 | — | completedsumbong source |
| Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase I), Datu Odin Sinsuat, Maguindanao22M00020 | 100% | August 27, 2023 | July 25, 2023 | — | completedsumbong source |
Rule Definition
Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.
Triggering Data & citations
Contractor holds a large share of flood-control contract value in its district/province
{
"hhi": 0.19865002850929794,
"scope": "province",
"bucketKey": "province:MAGUINDANAO DEL NORTE",
"contractor": "FFJJ CONST",
"thresholds": {
"share": 0.25,
"minContracts": 3,
"minBucketContracts": 10
},
"bucketTotalPhp": 1008340373.8100001,
"contractorShare": 0.3328006498659074,
"contractorTotalPhp": 335576331.69,
"contractorContracts": 3
}Source documents
Possible Innocent Explanations
- This may be due to limited competition or the contractor's specialized expertise in the area.