Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 24BF0044 was awarded at 99.99% of its ABC. Across its 33 recorded contracts, JWU CONST AND SUPPLY was awarded at ≥99.5% of ABC 33 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding where the winning bid is just below the ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Slope Protection Structure for Cagayan River Basin, Magat River, Aplat Section, Package 2, Aurora, Isabela24BF0044 | 100% | August 9, 2025 | March 21, 2025 | — | completedsumbong source |
Start: July 17, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Isabela 2nd District Engineering Office",
"ratio": 0.9999312428324698,
"abcPhp": 144750000,
"threshold": 0.995,
"contractId": "24BF0044",
"contractor": "JWU CONST AND SUPPLY",
"contractCostPhp": 144740047.4
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to highly competitive bidding where the winning bid is just below the ABC.