Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24BF0044 was awarded at 99.99% of its ABC. Across its 33 recorded contracts, JWU CONST AND SUPPLY was awarded at ≥99.5% of ABC 33 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding where the winning bid is just below the ABC.

Public record entityConstruction of Slope Protection Structure for Cagayan River Basin, Magat River, Aplat Section, Package 2, Aurora, Isabela
LocationAURORA (ISABELA), ISABELA, Region IIContract 24BF0044
Amount₱144,740,047.4099.99% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection Structure for Cagayan River Basin, Magat River, Aplat Section, Package 2, Aurora, Isabela24BF0044100%August 9, 2025March 21, 2025—completedsumbong source

Start: July 17, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 2nd District Engineering Office",
  "ratio": 0.9999312428324698,
  "abcPhp": 144750000,
  "threshold": 0.995,
  "contractId": "24BF0044",
  "contractor": "JWU CONST AND SUPPLY",
  "contractCostPhp": 144740047.4
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to highly competitive bidding where the winning bid is just below the ABC.