Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23B00057 and 24BE0066 have near-identical descriptions about 1103 m apart (funding years 2023, 2024; ₱189.90M, ₱144.73M). Worth checking whether they cover the same works. These may be sequential or adjacent slope protection works along the same stretch of river, funded in different years.

Public record entityConstruction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, Isabela
LocationSANTA MARIA (ISABELA), ISABELA, Region IIContract 24BE0066
Amount₱144,734,339.40 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, Isabela24BE0066Flood control100%April 17, 2025October 18, 2024—completedsumbong source

Start: April 29, 2024 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "24BE0066",
  "fundingYear": 2024,
  "municipality": "SANTA MARIA (ISABELA)",
  "distanceMeters": 1102.8452097665158,
  "titleSimilarity": 0.9729649376667407
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately