Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22FC0074 and 23FC0061 have near-identical descriptions about 2834 m apart (funding years 2022, 2023; ₱33.27M, ₱48.25M). Worth checking whether they cover the same works. It is possible these are separate contracts for different segments or a continuation of the same project not labelled as a new phase.

Public record entityConstruction of Flood Control Structure (Phase 1) at Brgy. Mabilo, Labo, Camarines Norte
LocationLABO (CAMARINES NORTE), CAMARINES NORTE, Region VContract 23FC0061
Amount₱48,250,000.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure (Phase 1) at Brgy. Mabilo, Labo, Camarines Norte23FC0061Flood control100%May 8, 2024May 8, 2024—completedsumbong source

Start: April 5, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23FC0061",
  "fundingYear": 2023,
  "municipality": "LABO (CAMARINES NORTE)",
  "distanceMeters": 2834.3823470629654,
  "titleSimilarity": 1
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately