Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CJ0242 lists a cost of ₱25.00M, 2.04% above its Approved Budget for the Contract of ₱24.50M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a clerical error or a post-bid adjustment that was not reflected in the ABC field.

Public record entityConstruction of Flood Structure along Ungot Creek (Segment U), Tarlac City, Tarlac
LocationCITY OF TARLAC (CAPITAL) (TARLAC), TARLAC, Region IIIContract 24CJ0242
Amount₱25,000,000.00102.04% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Structure along Ungot Creek (Segment U), Tarlac City, Tarlac24CJ0242Flood control100%July 22, 2024June 18, 2024—completedsumbong source

Start: February 20, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Tarlac District Engineering Office",
  "ratio": 1.0204081632653061,
  "abcPhp": 24500000,
  "threshold": 0.995,
  "contractId": "24CJ0242",
  "contractor": "T2B3 BUILDERS AND SUPPLIES CORP",
  "contractCostPhp": 25000000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a clerical error or a post-bid adjustment that was not reflected in the ABC field.