Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22OB0100 lists a cost of ₱96.50M, 0.00% above its Approved Budget for the Contract of ₱96.50M. Under RA 9184, awards normally may not exceed the ABC. This small excess may be due to rounding or data encoding differences.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Slope Protection Along Taguig River, Facing Downstream (East Bank), Package 2, Taguig City22OB0100Flood control | 100% | October 13, 2022 | July 27, 2022 | — | completedsumbong source |
Start: February 16, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Metro Manila 1st District Engineering Office",
"ratio": 1.0000065762090493,
"abcPhp": 96499365.4,
"threshold": 0.995,
"contractId": "22OB0100",
"contractor": "TOPNOTCH CATALYST BUILDERS INC",
"contractCostPhp": 96500000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This small excess may be due to rounding or data encoding differences.