Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 3 contracts awarded to C & F CONST & DEVELOPMENT CORP by the same office started within 56 days, each between β±42.5M and β±50M (just under the β±50M threshold), with 3 in the same municipality. It is possible these are separate phases or segments of a larger flood control project, each bid out individually.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error Β· Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Sturcture along Santa Maria River and its Tributaries, Sta. 09 + 100 to Sta. 09 + 300 (Balasing -Pulong Buhangin Section), Santa Maria, Bulacan24CD0010Flood control | 100% | October 26, 2024 | October 26, 2024 | β | completedsumbong source |
Start: February 12, 2024 Β· Source fetched October 21, 2026
Rule Definition
β₯3 contracts within 120 days, each 85β100% of β±50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Bulacan 2nd District Engineering Office",
"contractId": "24CD0010",
"contractor": "C & F CONST & DEVELOPMENT CORP",
"windowDays": 120,
"clusterSize": 3,
"thresholdPhp": 50000000,
"contractCostPhp": 49496490.33,
"averageTitleSimilarity": 0.9517578934153537
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program