Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22DQ0069 was awarded at 100.00% of its ABC. Across its 21 recorded contracts, GRAIA CONST CORP was awarded at ≥99.5% of ABC 21 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the contractor simply bid the maximum allowed amount, which is permitted under procurement rules.

Public record entityConstruction of Revetment along Maliksi River (tributary to Manila Bay), Phase 2, Bacoor City, Cavite
LocationBACOOR CITY (CAVITE), CAVITE, Region IV-AContract 22DQ0069
Amount₱98,999,140.73100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Revetment along Maliksi River (tributary to Manila Bay), Phase 2, Bacoor City, Cavite22DQ0069100%August 2, 2024December 7, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 7, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cavite 3rd District Engineering Office",
  "ratio": 0.9999913348483607,
  "abcPhp": 98999998.58,
  "threshold": 0.995,
  "contractId": "22DQ0069",
  "contractor": "GRAIA CONST CORP",
  "contractCostPhp": 98999140.73
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteCity of BacoorTalaba 2
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault9.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA2 (3.01-4 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.