Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 21LB0296 was awarded at 100.00% of its ABC. Across its 29 recorded contracts, GENESIS88 CONST INC was awarded at ≥99.5% of ABC 29 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to consistently precise cost estimates or competitive bidding that matches the ABC exactly.

Public record entityConstruction of Revetment along Talomo River, Sta. 3 + 542 to Sta. 3 + 817, Right Bank, Davao City
LocationDAVAO DEL SUR, Region XIContract 21LB0296
Amount₱88,780,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Revetment along Talomo River, Sta. 3 + 542 to Sta. 3 + 817, Right Bank, Davao City21LB0296100%February 25, 2023February 25, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: December 16, 2021 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Davao City District Engineering Office",
  "ratio": 1,
  "abcPhp": 88780000,
  "threshold": 0.995,
  "contractId": "21LB0296",
  "contractor": "GENESIS88 CONST INC",
  "contractCostPhp": 88780000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to consistently precise cost estimates or competitive bidding that matches the ABC exactly.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)City of DavaoTalomo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault0.4 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA3 (4.01-5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.