Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CC0455 was awarded at 100.00% of its ABC. Across its 15 recorded contracts, TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC was awarded at ≥99.5% of ABC 15 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding or precise cost estimation.

Public record entityConstruction/Improvement of Slope Protection Structures and Waterways, Barangay San Jose, Calumpit, Bulacan
LocationCALUMPIT (BULACAN), BULACAN, Region IIIContract 24CC0455
Amount₱98,998,602.60100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction/Improvement of Slope Protection Structures and Waterways, Barangay San Jose, Calumpit, Bulacan24CC0455100%February 14, 2025December 11, 2024—completedsumbong source

Start: May 21, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Bulacan 1st District Engineering Office",
  "ratio": 0.9999883075474298,
  "abcPhp": 98999760.15,
  "threshold": 0.995,
  "contractId": "24CC0455",
  "contractor": "TOPNOTCH CATALYST BUILDERS INC / ONE FRAME CONST INC",
  "contractCostPhp": 98998602.6
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to highly competitive bidding or precise cost estimation.