Contract Splitting Pattern
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining β not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 6 contracts awarded to SILVER DRAGON CONST & LUMBER & GLASS SUPPLY INC by the same office started within 49 days, each between β±42.5M and β±50M (just under the β±50M threshold), with 4 in the same municipality. It is possible that these are separate projects for different rivers or barangays, which may have been planned together for efficiency.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Bank Protection Structure along Calumangan River, Bago City, Negros Occidental22GN0066 | 100% | January 25, 2023 | December 20, 2022 | β | completedsumbong source |
Start: March 31, 2022 Β· Source fetched October 21, 2026
Rule Definition
β₯3 contracts within 120 days, each 85β100% of β±50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Negros Occidental 4th District Engineering Office",
"contractId": "22GN0066",
"contractor": "SILVER DRAGON CONST & LUMBER & GLASS SUPPLY INC",
"windowDays": 120,
"clusterSize": 6,
"thresholdPhp": 50000000,
"contractCostPhp": 48794199.32,
"averageTitleSimilarity": 0.871323786986172
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program