Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 23HF0113 was awarded at 100.00% of its ABC. Across its 88 recorded contracts, QM BUILDERS was awarded at ≥99.5% of ABC 84 times (95.5%), versus 70.4% for flood-control contracts overall. It is possible that the contractor bid exactly at the ABC to maximize their chances of winning within the legal limit.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Reconstruction of Flood Control along Santander-Barili-Toledo Road, K0065+400 - K0065+70023HF0113Flood control | 100% | November 10, 2024 | November 8, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: January 9, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Cebu 3rd District Engineering Office",
"ratio": 1,
"abcPhp": 92108285,
"threshold": 0.995,
"contractId": "23HF0113",
"contractor": "QM BUILDERS",
"contractCostPhp": 92108285
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate