Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22CC0143 was awarded at 100.00% of its ABC. Across its 48 recorded contracts, TOPNOTCH CATALYST BUILDERS INC was awarded at ≥99.5% of ABC 45 times (93.8%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding where the winning bid matches the ABC exactly.

Public record entityRehabilitation of Flood Control Structure along Angat River, Parulan Section, Sta. 0 + 000 to Sta. 0 + 353.60, Plaridel, Bulacan
LocationPLARIDEL (BULACAN), BULACAN, Region IIIContract 22CC0143
Amount₱48,998,995.93100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of Flood Control Structure along Angat River, Parulan Section, Sta. 0 + 000 to Sta. 0 + 353.60, Plaridel, Bulacan22CC0143Flood control100%May 13, 2023May 13, 2023—completedsumbong source

Start: February 18, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Bulacan 1st District Engineering Office",
  "ratio": 0.9999897637725774,
  "abcPhp": 48999497.5,
  "threshold": 0.995,
  "contractId": "22CC0143",
  "contractor": "TOPNOTCH CATALYST BUILDERS INC",
  "contractCostPhp": 48998995.93
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to highly competitive bidding where the winning bid matches the ABC exactly.