Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Schedule / Date Inconsistencies

Completion before start, implausible duration for cost, or future dates marked complete.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23CI0047 (₱24.50M) is recorded as completed in 48 days against 119 planned; similar-cost projects take a median of 182 days, putting it in the fastest 1.4%. The contractor may have worked more efficiently than expected or benefited from favorable conditions.

Public record entityConstruction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Amsic to Brgy. Anunas, Angeles City, Pampanga Phase 2
LocationANGELES CITY (PAMPANGA), PAMPANGA, Region IIIContract 23CI0047
Amount₱24,495,203.65 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Amsic to Brgy. Anunas, Angeles City, Pampanga Phase 223CI0047100%July 3, 2023April 23, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 6, 2023 · Source fetched October 21, 2026

Rule Definition

Compares start, target, and actual dates from Sumbong with contract cost.

Triggering Data & citations

Contract schedule fields are inconsistent or implausible

{
  "issues": [
    "implausibly_short_duration"
  ],
  "startDate": "2023-03-06T00:00:00.000Z",
  "contractId": "23CI0047",
  "actualEndDate": "2023-04-23T00:00:00.000Z",
  "targetEndDate": "2023-07-02T00:00:00.000Z",
  "contractCostPhp": 24495203.65
}

Possible Innocent Explanations

  • Revised dates not yet reflected in Sumbong export
  • Early completion certificate vs planned start typo

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)City of AngelesMalabañas
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault28.1 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.