Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23GA0107 and 22GA0032 have near-identical descriptions about 137 m apart (funding years 2022, 2023; ₱29.40M, ₱49.00M). Worth checking whether they cover the same works. It is possible that the second contract is a continuation or extension of the first project, but this is not labeled in the titles.

Public record entityConstruction of Revetment Wall along Aklan River, Barangay Bakhaw Sur, Kalibo, Aklan
LocationKALIBO (CAPITAL) (AKLAN), AKLAN, Region VIContract 23GA0107
Amount₱29,399,989.61 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Revetment Wall along Aklan River, Barangay Bakhaw Sur, Kalibo, Aklan23GA0107100%January 5, 2024November 23, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: May 10, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23GA0107",
  "coordinates": {
    "lat": 11.71899,
    "lon": 122.37134
  },
  "municipality": "KALIBO (CAPITAL) (AKLAN)",
  "distanceMeters": 136.54247433524972,
  "titleSimilarity": 1
}

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)AklanKaliboBachaw Sur
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault20.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.