Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23FE0061 was awarded at 100.00% of its ABC. Across its 115 recorded contracts, LEGACY CONST CORP FORMERLY: LEGACY CONST was awarded at ≥99.5% of ABC 100 times (87.0%), versus 70.4% for flood-control contracts overall. It is possible that the winning bid simply matched the ABC due to precise cost estimation or lack of competition.

Public record entityConstruction of Riverbank Protection Structures (along cut-off channel) within Bicol River Basin, Brgy. Malbong, Gainza, Camarines Sur
LocationGAINZA (CAMARINES SUR), CAMARINES SUR, Region VContract 23FE0061
Amount₱74,250,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Riverbank Protection Structures (along cut-off channel) within Bicol River Basin, Brgy. Malbong, Gainza, Camarines Sur23FE0061Flood control100%February 10, 2024November 20, 2023—completedsumbong source

Start: April 4, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Camarines Sur 2nd District Engineering Office",
  "ratio": 1,
  "abcPhp": 74250000,
  "threshold": 0.995,
  "contractId": "23FE0061",
  "contractor": "LEGACY CONST CORP FORMERLY: LEGACY CONST",
  "contractCostPhp": 74250000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate