Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22JA0038 lists a cost of ₱4.80M, 7.72% above its Approved Budget for the Contract of ₱4.46M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a post-award contract variation that was not reflected in the ABC field.

Public record entityConstruction of Drainage System at Barangay Guiwan, Zamboanga City, Zamboanga del Sur
LocationZAMBOANGA CITY (ZAMBOANGA DEL SUR), ZAMBOANGA DEL SUR, Region IXContract 22JA0038
Amount₱4,801,870.31107.72% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Drainage System at Barangay Guiwan, Zamboanga City, Zamboanga del Sur22JA0038100%October 19, 2022October 19, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 23, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Zamboanga City 2nd District Engineering Office",
  "ratio": 1.0772163354465991,
  "abcPhp": 4457665.7,
  "threshold": 0.995,
  "contractId": "22JA0038",
  "contractor": "TERRAINSHAPER CONST AND ENT",
  "contractCostPhp": 4801870.31
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a post-award contract variation that was not reflected in the ABC field.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)City of ZamboangaGuiwan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault10.8 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.