Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 6 contracts awarded to CS CONST AND SUPPLY INC FORMERLY: CS CONST AND SUPPLY by the same office started within 91 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is possible that these are separate flood control projects in different sections or sitios, each requiring its own contract.

Public record entityConstruction of Flood Control Structure, Barangay Udtong Proper, Lambayong, Sultan Kudarat
LocationSULTAN KUDARAT, Region XIIContract 21MF0055
Amount₱45,250,027.88 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure, Barangay Udtong Proper, Lambayong, Sultan Kudarat21MF0055Flood control100%October 21, 2022October 18, 2022—completedsumbong source

Start: November 23, 2021 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Sultan Kudarat 1st District Engineering Office",
  "contractId": "21MF0055",
  "contractor": "CS CONST AND SUPPLY INC FORMERLY: CS CONST AND SUPPLY",
  "windowDays": 120,
  "clusterSize": 6,
  "thresholdPhp": 50000000,
  "contractCostPhp": 45250027.88,
  "averageTitleSimilarity": 0.9038540338815159
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program