Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 3 contracts awarded to VEN RAY CONST CORP by the same office started within 106 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is possible that these are separate projects in different barangays or river sections, each requiring individual contracts.

Public record entityConstruction of Shoreline Protection at Barangay Talavera along Toledo-Tabuelan-Sn Remigio Rd, Toledo City, Cebu
LocationTOLEDO CITY (CEBU), CEBU, Region VIIContract 23HF0002
Amount₱48,938,244.75 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Shoreline Protection at Barangay Talavera along Toledo-Tabuelan-Sn Remigio Rd, Toledo City, Cebu23HF0002Flood control100%May 25, 2024May 24, 2024—completedsumbong source

Start: October 19, 2023 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold in one municipality

{
  "deo": "Cebu 3rd District Engineering Office",
  "contractId": "23HF0002",
  "contractor": "VEN RAY CONST CORP",
  "windowDays": 120,
  "clusterSize": 3,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48938244.75,
  "maxInOneMunicipality": 3
}