Bid-Ceiling Hugging
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 24BB0086 was awarded at 99.99% of its ABC. Across its 24 recorded contracts, TJMT CONST was awarded at ≥99.5% of ABC 23 times (95.8%), versus 70.4% for flood-control contracts overall. This pattern may result from consistently precise cost estimation or competitive bidding that drives prices close to the ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control, Zone 1, Barangay San Jose, Baggao, Cagayan24BB0086Flood control | 100% | November 21, 2024 | July 1, 2024 | — | completedsumbong source |
Start: March 7, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Cagayan 1st District Engineering Office",
"ratio": 0.9998800468393781,
"abcPhp": 48250000,
"threshold": 0.995,
"contractId": "24BB0086",
"contractor": "TJMT CONST",
"contractCostPhp": 48244212.26
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate