Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24A00455 was awarded at 100.00% of its ABC. Across its 44 recorded contracts, MG SAMIDAN CONST was awarded at ≥99.5% of ABC 42 times (95.5%), versus 70.4% for flood-control contracts overall. It is possible that the contractor bid exactly at the ABC to maximize their chance of winning within legal limits.

Public record entityConstruction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 4, Binalonan -Laoac, Pangasinan
LocationBINALONAN (PANGASINAN), PANGASINAN, Region IContract 24A00455
Amount₱48,249,924.40100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Riverbank Structure along Aloragat and Allied Rivers, Package 4, Binalonan -Laoac, Pangasinan24A00455Flood control100%December 10, 2024December 10, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 26, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Pangasinan 3rd District Engineering Office",
  "ratio": 0.9999984331606218,
  "abcPhp": 48250000,
  "threshold": 0.995,
  "contractId": "24A00455",
  "contractor": "MG SAMIDAN CONST",
  "contractCostPhp": 48249924.4
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate