Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 3 contracts awarded to E GARCIA CONST CORP FOR E GARCIA CONST by the same office started within 7 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is possible that these are separate flood mitigation projects for different sitios within the same municipality, each requiring its own contract.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Mitigation Structure (Seawall) along Lamit Bay, Manggogon, Lagonoy, Camarines Sur22FG0041Flood control | 100% | June 30, 2023 | June 24, 2023 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: March 17, 2022 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Camarines Sur 4th District Engineering Office",
"contractId": "22FG0041",
"contractor": "E GARCIA CONST CORP FOR E GARCIA CONST",
"windowDays": 120,
"clusterSize": 3,
"thresholdPhp": 50000000,
"contractCostPhp": 49000000,
"averageTitleSimilarity": 0.955296391847865
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program