Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 3 contracts awarded to ZYRE TRADING AND CONST by the same office started within 49 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is possible these are legitimately separate phases or packages of a larger project, each procured separately as allowed by regulations.

Public record entityConstruction/Rehabilitation of Retaining Wall along Sta. Ana River, Pateros, Metro Manila (Package VII)
LocationPATEROS (METROPOLITAN MANILA), PATEROS, National Capital RegionContract 24OB0158
Amount₱48,485,215.11 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction/Rehabilitation of Retaining Wall along Sta. Ana River, Pateros, Metro Manila (Package VII)24OB0158100%November 29, 2024November 15, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 1, 2024 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Metro Manila 1st District Engineering Office",
  "contractId": "24OB0158",
  "contractor": "ZYRE TRADING AND CONST",
  "windowDays": 120,
  "clusterSize": 3,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48485215.11,
  "averageTitleSimilarity": 0.9681527274990405
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)PaterosSan Roque
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active fault0.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.