Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 24AF0055 and 24AF0014 have near-identical descriptions about 443 m apart (funding year 2024; ₱96.49M, ₱48.74M). Worth checking whether they cover the same works. It is possible these are separate segments or phases of flood control works in the same barangay, handled by different contractors.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structures along Bauang River Basin, Barangay Cabaritan Sur, Naguilian, La Union24AF0014Flood control | 100% | August 11, 2024 | May 20, 2024 | — | completedsumbong source |
Start: February 6, 2024 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "24AF0014",
"coordinates": {
"lat": 16.523672,
"lon": 120.38738
},
"municipality": "NAGUILIAN (LA UNION)",
"distanceMeters": 442.9394253371209,
"titleSimilarity": 0.9732142857142857
}Source documents
