Contract Splitting Pattern

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining β€” not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 5 contracts awarded to YZK BUILDERS by the same office started within 34 days, each between β‚±42.5M and β‚±50M (just under the β‚±50M threshold), with 4 in the same municipality. It is possible that these are separate flood control projects needed in different barangays along the same river.

Public record entityConstruction of Pinacanauan River Flood Control Project, barangay Binatug, San Mariano, Isabela
LocationSAN MARIANO (ISABELA), ISABELA, Region IIContract 23BG0002
Amountβ‚±48,265,637.80 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β€” not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Pinacanauan River Flood Control Project, barangay Binatug, San Mariano, Isabela23BG0002Flood control100%October 12, 2023June 5, 2023β€”completedsumbong source

Start: March 8, 2023 Β· Source fetched October 21, 2026

Rule Definition

β‰₯3 contracts within 120 days, each 85–100% of β‚±50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Isabela 3rd District Engineering Office",
  "contractId": "23BG0002",
  "contractor": "YZK BUILDERS",
  "windowDays": 120,
  "clusterSize": 5,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48265637.8,
  "averageTitleSimilarity": 0.9454104785009713
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program