Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 24AD0076 and 23AD0043 have near-identical descriptions about 62 m apart (funding years 2023, 2024; ₱48.25M, ₱29.40M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or expansion of the first, or covers a different part of the same river.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Balidbid River Control, Barangay Balidbid, Salcedo, Ilocos Sur23AD0043Flood control | 100% | October 19, 2023 | July 8, 2024 | — | completedsumbong source |
Start: March 22, 2023 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "23AD0043",
"coordinates": {
"lat": 17.145834,
"lon": 120.547775
},
"municipality": "SALCEDO (BAUGEN) (ILOCOS SUR)",
"distanceMeters": 61.93557414108424,
"titleSimilarity": 1
}Source documents
