ANDROMEDA CONST SERVICES AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 11 linked DPWH project(s) totaling about ₱297,989,524.08. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
ANDROMEDA CONST SERVICES AND SUPPLY
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 11
- Total value
- ₱297,989,524.08
- Published flags
- 0
- Region
- Bulacan 1st DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for ANDROMEDA CONST SERVICES AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 69.10 / 100 · Projects in sample: 11 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 40/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 40
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 5
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 11
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 11
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 11
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 11
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
10 geotagged projects — Open full map
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (EARTHDIKE) ALONG MANGALCAL CREEK BOTH SIDES, CARMEN, DAVAO DEL NORTE24L00247 · ₱144,061,934.05 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DOMOLOG RIVER, BINDOY, NEGR25HJ0004 · ₱38,690,515.47 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LINGAYAO RIVER, MANAY, DAVAO ORIENTAL24LF0121 · ₱38,588,802.16 · mapped
- CONSTRUCTION OF ENLISTED PERSONNEL BARRACKS (BUILDING 1), FORT BONIFACIO, TAGUIG CITY24O00129 · ₱37,902,996.91
- ROAD CONCRETING OF BARANGAY BAGBAGUIN, PANDI, BULACAN18CC0196 · ₱8,112,360.68 · mapped
- ROAD CONCRETING BARANGAY TANAWAN, BUSTOS, BULACAN18CC0194 · ₱8,109,305.69 · mapped
- REHABILITATION OF ROADS WITH BRIDGE REPLACEMENT BRGY. 171, CALOOCAN CITY18OD0184 · ₱8,096,508.68 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGSINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: DRAINAGE IMPROVEMENT ALONG TECSON ST., MANILA CITY STA. 0+000.00 TO STA. 018OE0029 · ₱4,852,369.59 · mapped
- LIP: CONCRETING WITH DRAINAGE IMPROVEMENT OF TAYUMAN ST., MANILA CITY 2ND LD MANILA CITY 2ND LEGISLATIVE DISTRICT17OE0184 · ₱4,712,360.14 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - BIGAA-PLARIDEL VIA BULACAN AND MALOLOS ROAD K0051+000 TO K0051+750 PLARIDEL, BULACAN18CC0243 · ₱3,392,127.55 · mapped
- CONSTRUCTION OF RIP RAP IN LOOK 1ST, CITY OF MALOLOS, BULACAN18CC0227 · ₱1,470,243.16 · mapped
Published indicators (1)
A6 · Low-Graded DPWH Contractor Winning DepEd/DOH Works
Indicator: ANDROMEDA CONSTRUCTION SERVICES AND SUPPLY, which has a record grade of D on this site (a summary of public data on 11 DPWH projects, not a government blacklist), won 2 DepEd/DOH infrastructure awards worth ₱2.58M. A D grade may reflect delays or issues in past DPWH projects, but does not automatically disqualify a contractor from winning new awards.
Indicator worth a closer look. Not an accusation or a finding of wrongdoing. Details, dispute or reply
Indicators are statistical patterns in public PhilGEPS award records, reviewed before publication. They are not findings of wrongdoing. See the methodology; named parties may reply or request a correction.
Across government
- DPWH Infrastructure: 9 awards · ₱220,602,696.07
- Batangas State University Infrastructure: 2 awards · ₱11,374,547.60
- AFPPS Goods & services: 7 awards · ₱3,097,317.00
- DepEd Infrastructure: 2 awards · ₱2,582,057.34
- 24O00129
- R&M Other Structures
- R&M Other Structures
- R&M Other Structures
- R&M Other Structures
- R&M Other Structures
- R&M Other Structures
- R&M Other Structures
- 24L00247 Construction of Flood Mitigation₱144,061,934.05· 2024-05-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGION XI
- Tanawan, Bustos, Bulacan₱8,109,305.69· 2018-09-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- Bagbaguin, Pandi, Bulacan₱8,112,360.68· 2018-09-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- Bigaa-Plaridel via Bulacan and Malolos Road K0051+₱3,392,127.55· 2018-06-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- Look 1st, City of Malolos, Bulacan₱1,470,243.16· 2018-05-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BULACAN 1ST DEO
- 18OD0184₱8,096,508.68· 2018-04-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - METRO MANILA 3RD E
- CY 2018 Basic Educational Facilities Fund Repair o
- CY 2018 Basic Educational Facilities Fund Repair o
- Flood Management Program₱4,744,859.21· 2018-01-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH METRO MANILA
- Construction Project
- Construction Project
- Concreting₱4,712,360.14· 2017-12-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - NORTH METRO MANILA
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
