SUN RAYS BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 10 linked DPWH project(s) totaling about ₱98,931,417.71. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
SUN RAYS BUILDERS
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 10
- Total value
- ₱98,931,417.71
- Published flags
- 0
- Region
- Romblon DEO · Region IV-B
Public Record Grade
A transparent, data-derived summary of reported public records for SUN RAYS BUILDERS — not an accusation or finding of wrongdoing.
Score: 79.70 / 100 · Projects in sample: 10 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 80
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 6
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 10
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 10
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 10
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 10
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 10
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
9 geotagged projects — Open full map
- CONCRETING OF DONA TRINIDAD TO MABINI ROAD, STA. 000 + 000 - STA. 000 + 620, BRGY. DONA TRINIDAD, SAN ANDRES, ROMBLON19EH0057 · ₱29,399,768.62 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF BARIRI SLOPE PROTECTION, STA. 000 + 110 - STA. 000 + 217.60 (B/S) (AS PER SURVEY), SITIO BARIRI, HINAG-OMAN, FERROL, ROMBLON19EH0036 · ₱18,906,122.68 · mapped
- CONSTRUCTION OF ROADS, BRGY. TANAGAN AND BRGY. VICTORIA, STA. 000 + 000 - STA. 000 + 600, SAN ANDRES, ROMBLON19EH0054 · ₱14,525,326.29 · mapped
- CONSTRUCTION OF ROADS, BRGY. TANAGAN AND BRGY. VICTORIA, SAN ANDRES, ROMBLON18EH0108 · ₱9,517,346.91 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH ROOF DECK, BRGY. INDUSTRIAL VALLEY COMPLEX, MARIKINA CITY19OB0426 · ₱7,294,579.55 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BGRY. MAINIT, BANTON, ROMBLON20EH0052 · ₱5,797,661.88 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING/MULTI-PURPOSE HALL AT BARANGAY AGNOCNOC, FERROL, ROMBLON21EH0083 · ₱4,950,000.00 · mapped
- CONCRETING OF SITIO LANDING - ATABAY - BAGOLAYAG, TUBIGON FMR, BRGY. TUBIGON, FERROL, ROMBLON17EH0063 · ₱4,851,924.55
- CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (COVERED COURT) AT BARANGAY TUGDAN, ALCANTARA, ROMBLON21EH0064 · ₱1,940,399.99 · mapped
- PREVENTIVE MAINTENANCE (TERTIARY) - LOOC(COGON TULAY) - ODIONGAN ROAD, TABLAS ISLAND, ROMBLON19EH0001 · ₱1,748,287.24 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
