ELITE GEN CONTRACTOR AND DEVELOPMENT CORP 49128 is listed as a company organization in Philippine public procurement records on this site, with 99 linked DPWH project(s) totaling about ₱5,904,598,657.25. No delivery grade published yet (insufficient linked public records).
ELITE GEN CONTRACTOR AND DEVELOPMENT CORP 49128
N/GRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 99
- Total value
- ₱5,904,598,657.25
- Published flags
- 0
- Region
- Bulacan 1st DEO · National Capital Region
Public Record Grade
A transparent, data-derived summary of reported public records for ELITE GEN CONTRACTOR AND DEVELOPMENT CORP 49128 — not an accusation or finding of wrongdoing.
Not graded yet — the Public Record Grade has not been computed for this contractor.
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
50 geotagged project(s) — Open full map
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN PEDRO (DOWNSTREAM), SAN JOSE, OC24E00150 · ₱232,444,429.37 · mapped
- OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, VILLAFLOR SECTION, LOBOC, BOHOL23H00009 · ₱213,868,286.84 · mapped
- OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, CANLASID SECTION, LOBOC, BOHOL23H00043 · ₱192,999,995.69 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINOLASO, DOLORES, EASTERN SAMAR24I00042 · ₱190,893,425.22 · mapped
- FY 2024 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSUNISAN DIVERSION ROAD, PACKAGE 4, QUEZON24D00149 · ₱189,140,831.33 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY MALINAO, TAFT, EASTERN SAMAR24I00043 · ₱188,498,554.39 · mapped
- OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, AGAPE SECTION, LOBOC, BOHOL23H00044 · ₱166,335,073.13 · mapped
- CONSTRUCTION OF NATIONAL TOBACCO ADMINISTRATION BUILDING, QUEZON CITY (PHASE 3) (RE-ADVERTISEMENT)24O00039 · ₱141,531,018.07 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG BONGO RIVER, NUEVA ERA, ILOCOS NORTE24A00226 · ₱106,149,906.66 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AKLAN RIVER (PACKAGE 2-A), KALIBO, AKLAN24GA0249 · ₱105,089,366.83 · mapped
- CONSTRUCTION OF MULTI STOREY BUILDING AT PLAINVIEW ELEMENTARY SCHOOL PACKAGE 1, MANDALUYONG CITY25OB0355 · ₱97,514,946.01 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE III AT DATAG RIVER (DO24HM0014 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE IV24CL0027 · ₱96,498,275.66 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE I24CL0024 · ₱96,497,927.49 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE II24CL0025 · ₱96,497,921.18 · mapped
- CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 3, SAN FELIPE, ZAMBALES24CL0060 · ₱96,497,263.63 · mapped
- REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER (PALUDPUD SECTION, RIGHT BANK), PACKAGE H, LA PAZ, TARLAC24CK0047 · ₱96,492,827.75 · mapped
- CONSTRUCTION OF MANUEL PERALTA LATIAN DATA ANGGAS-ALABEL BYPASS ROAD, MALITA, DAVAO OCCIDENTAL23LE0044 · ₱96,490,433.08 · mapped
- CONSTRUCTION OF H-WAY JCT. MANA-TICULON-LAGUMIT-LITTLE BAGUIO-ALABEL ROAD, MALITA, DAVAO OCCIDENTAL23LE0051 · ₱96,489,995.48 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION AT BASECO COMPOUND, PORT AREA, BRGY. 649, ZONE 68, MANILA, PHASE 3,STA 0+398 TO S24OH0049 · ₱96,400,275.97 · mapped
- REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER, PACKAGE G, (MATAYUMTAYUM SECTION, RIGHT BANK), LA PAZ, TARLAC24CK0052 · ₱96,397,645.50 · mapped
- ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT. PROGRAM--CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION AT BASECO COMPOUND,PORT AREA, MANILA,STA.0+000 TO STA.0+294.50,PHASE 124OH0005 · ₱96,390,564.94 · mapped
- CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 9, SAN NARCISO, ZAMBALES24CL0051 · ₱95,535,420.88 · mapped
- REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXII), QUEZON CITY25OG0020 · ₱94,556,651.36 · mapped
- CONSTRUCTION OF NATIONAL TOBACCO ADMINISTRATION BUILDING, QUEZON CITY (PHASE 4)25O00105 · ₱94,425,702.31 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG MALITLIT, WATERWAYS (NEAR ETON GREENFIELD PARKWAY BRIDGE), SANTA ROSA CITY, LAGUNA24DI0016 · ₱94,119,755.90 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE, PARK SPRING VILLAGE, PHASE 2, SAN PEDRO CITY, LAGUNA25DI0014 · ₱93,991,000.00 · mapped
- CONSTRUCTION OF STRUCTURE FOR RIVER PROTECTION, NEAR BAGONG SILANG PHASE 1, SAN PEDRO CITY LAGUNA25DI0050 · ₱93,809,057.27 · mapped
- REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER (MATAYUMTAYUM SECTION, RIGHT BANK), U/S OF RIO CHICO BRIDGE, PHASE 1, STA. 14+395.50 TO STA. 14+837.48, LA PAZ, TARLAC24CK0045 · ₱93,602,191.60 · mapped
- CONSTRUCTION OF DAMPALIT RIVERWALL (KAYLANAN CREEK) PHASE 10, MALABON CITY25OA0012 · ₱93,580,109.83 · mapped
- POLYTECHNIC UNIVERSITY OF THE PHILIPPINES- CONST. OF ACADEMIC BUILDING, PUP, SABLAYAN, OCC. MINDORO24E00216 · ₱93,578,798.77 · mapped
- POLYTECHNIC UNIVERSITY OF THE PHILIPPINES- CONSTRUCTION OF ACADEMIC BUILDING, PUP, BANSUD, ORIENTAL MINDORO24E00229 · ₱93,435,208.19 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MISAMIS OCCIDENTAL PROVINCIAL HOSPITAL), BARANGAY TALAIRON, OROQUIETA CITY, MISAMIS OCCIDENTAL.24KI0049 · ₱91,049,005.17 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT, FELIS FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL23LE0019 · ₱86,841,032.91 · mapped
- CONSTRUCTION OF SHORE PROTECTION (NEAR BAY) AT SAN PEDRO CITY, LAGUNA (PHASE 1)24DI0072 · ₱84,609,349.51 · mapped
- CONSTRUCTION OF MULTI LEVEL PURPOSE BUILDING, PLAINVIEW ELEMENTARY SCHOOL, BARANGAY PLAINVIEW, MANDALUYONG CITY25OB0351 · ₱79,155,751.57 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, POBLACION SECTION, PLARIDEL, BULACAN24CC0385 · ₱77,199,617.14 · mapped
- CONSTRUCTION (COMPLETION) OF NACIDA INCUBATOR FACILITY INCLUDING SITE DEVELOPMENT, BARANGAY CONCEPCION DOS, MARIKINA CITY24OB0488 · ₱73,120,510.13 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. PAGALA BALIUAG, BULACAN STA. 003+462 TO SR=TA. 003+76223CC0529 · ₱72,374,940.84 · mapped
- CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. SULIVAN BALIUAG, BULACAN STA.. 004+531 TO STA. 004+83123CC0532 · ₱72,374,865.51 · mapped
- REHABILITATION OF SLOPE PROTECTION ALONG BULI CREEK (LEFT BANK FACING DOWNSTREAM), PASIG CITY (PACKAGE 2)25OB0258 · ₱70,912,300.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM) AT BARANGAY STA. ANA, PATEROS, METRO MANILA25OB0176 · ₱66,535,283.44 · mapped
- REHABILITATION OF SLOPE PROTECTION ALONG BULI CREEK, PACKAGE 3 (RIGHT BANK FACING DOWNSTREAM), PASIG CITY25OB0235 · ₱66,185,000.00 · mapped
- LGU HOSPITALS - SIBUYAN DISTRICT HOSPITAL, SIBUYAN ISLAND, RIOMBLON24E00253 · ₱61,907,484.06 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY 601, ZONE 59, STA. MESA, MANILA24OE0177 · ₱59,399,903.58 · mapped
- CONSTRUCTION (COMPLETION) OF THE SCHOOL OF URBAN AND REGIONAL PLANNING (SURP) BUILDING, UP DILIMAN, QUEZON CITY23O00025 · ₱56,726,211.01 · mapped
- CONSTRUCTION OOF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS, BRGY. 170, CALOOCAN CITY25OD0098 · ₱48,116,514.07 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PAMAYANANG DIEGO SILANG, BRGY. USUSAN, TAGUIG CITY (PHASE 3)24OB0419 · ₱48,010,680.05 · mapped
- LGU HOSPITALS - ROMBLON PROVINCIAL HOSPITAL, ROMBLON, ROMBLON24E00251 · ₱47,916,002.08 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE, NEAR YAKAL BRIDGE, SAN PEDRO CITY, LAGUNA25DI0018 · ₱47,742,126.00 · mapped