N LIM DY CONST is listed as a company organization in Philippine public procurement records on this site, with 15 linked DPWH project(s) totaling about ₱531,523,434.04. Recorded delivery grade D (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
N LIM DY CONST
DRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 15
- Total value
- ₱531,523,434.04
- Published flags
- 0
- Region
- Cavite 1st DEO · Region IV-A
Online presence
Google Maps: N. Lim Dy ConstructionGoogle Maps, 2026-10-22
659 Congbalay Road, Kawit, 4104 Cavite
Licensed officers (PCAB)
- Norelito Nazaire Lim Dy · Authorized Managing Officer (PCAB license 32897) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for N LIM DY CONST — not an accusation or finding of wrongdoing.
Score: 65.00 / 100 · Projects in sample: 15 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 27.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 27.3
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 6
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 14
- pastTargetOngoingProjects
- 8
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 15
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 15
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 15
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
15 geotagged projects — Open full map
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG MALIMANGO RIVER, BRGY. LIGTONG 4, PHASE I24DF0102 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS CONST OF REVETMENT ALONG SAN JUAN RIVER, PHASE 3, BRGY MARULAS, KAWIT, CAVITE25DF0093 · ₱95,515,569.30 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAMMULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI PURPOSE BUILDING IN BRGY. BINAKAYAN, KAWIT, CAVITE (PHASE 2) - COMPLETION OF PUBLIC MARKET23DF0179 · ₱79,200,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE FACILITY (PHASE 1), BINAKAYAN, KAWIT, CAVITE22DF0327 · ₱69,300,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NOVELETA MUNICIPAL HALL), NOVELETA, CAVITE24DF0217 · ₱35,484,579.16 · mapped
- CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), BARANGAY ANIBAN 1 (FORMERLY ANIBAN 1, 3 AND 5), BACOOR CITY, CAVITE24DQ0030 · ₱29,402,958.31 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), NOVELETA, CAVITE24DF0273 · ₱29,402,843.64 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES ANDPROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONST OF REVETMENT ALONG PANAMITAN RIVER,BARANGAY SAN JOSE, NOVELETA24DF0016 · ₱29,103,038.33 · mapped
- CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG KAWIT-NOVELETA DIVERSION ROAD, TABON 1, KAWIT, CAVITE23DF0200 · ₱24,125,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - TERTIARY ROADSLABANAN SA BINAKAYAN DIV RD - K0022 + 449 - K0022 + 84623DF0183 · ₱16,201,214.39 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0029+260 - K0029+60024DF0012 · ₱10,885,611.34 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTUCTURE PROGRAM (BIP) MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES STRUCTURAL & RESILIENCE PROGRAM STRENGTHENING OF INFIRMARY HOSPITAL, BRGY. SAN JOSE I, NOVELETA, CAVITE23DF0104 · ₱4,899,507.70 · mapped
- CONVERGENCE & SPECIAL SUPPORT PROGBASIC INFRA PROGRAM (BIP)BIP - ACCESS ROADS &/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BLDG/ FACILITIESCONST OF DRAINAGE SYSTEM (CANAL LINING) AT COTABATO TO CALLEJON 1,BRGY.SAPA II,ROSARIO24DF0076 · ₱4,899,406.83 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAMREHABILITATION OF PNP STATION AT MUNICIPALITY OF NOVELETA, CAVITE24DF0118 · ₱4,896,885.43 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSKAWIT-NOVELETA-DIVERSION RD - K0022 + (-220) - K0022 + (-167)23DF0092 · ₱1,706,819.61 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
