KLD ENGINEERING CONST is listed as a company organization in Philippine public procurement records on this site, with 29 linked DPWH project(s) totaling about ₱211,100,575.19. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
KLD ENGINEERING CONST
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 29
- Total value
- ₱211,100,575.19
- Published flags
- 0
- Region
- Region XII · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for KLD ENGINEERING CONST — not an accusation or finding of wrongdoing.
Score: 75.20 / 100 · Projects in sample: 29 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 57.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 57.4
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 12
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 23
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 6
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 29
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 29
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 29
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
29 geotagged project(s) — Open full map
- CONSTRUCTION OF FARM-TO-MARKET (FMR), STA. 0+000.00 - STA. 1+100.00, BRGY. DATALPANDAN, GUINDULUNGAN, MAGUINDANAO DEL SUR24M00322 · ₱19,291,656.04 · mapped
- ROAD FROM DATU BALABARAN BONSAINFOOTBRIDGE, TAMONTAKA MOTHER NEAR THE SPECIAL ECONIMIC ZONE PASSING TO THE PROPOSED SEPTAGE TREATMENT PLANT FACILITY TO LEFT SIDE OF CITY HALL (PEOPLES PALACE) AND CHILDRENS PARK, BARANGAY ROSARY HEIGHTS 10 LEADING TO JUNCT20MA0036 · ₱18,274,732.88 · mapped
- CONSTRUCTION OF ROAD, BRGY. KAKAL TO CROSSING GUINIBON ROAD, DATU ABDULLAH SANGKI, MAGUINDANAO (PHASE 1), STA 0+000 - STA 1+120, DATU ABDULLAH SANGKI, MAGUINDANAO23M00215 · ₱14,743,908.41 · mapped
- CONCRETING OF BRGY. PINANTAO FMR, BRGY. PINANTAO, PARANG, MAGUINDANAO19MA0103 · ₱9,899,266.91 · mapped
- CONSTRUCTION OF 1-STOREY DIALYSIS CENTER, COTABATO CITY24M00254 · ₱9,861,271.88 · mapped
- CONSTRUCTION OF 1-STOREY DIALYSIS CENTER, MUNICIPALITY OF SULTAN KUDARAT, MAGUINDANAO DEL NORTE24M00255 · ₱9,850,213.17 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, FOR SENIOR CITIZEN PHASE 1, PARANG, MAGUINDANAO19MA0077 · ₱9,833,030.17 · mapped
- ACCESS ROAD LEADING TO OLD CITY HALL-COTABATO CITY INFORMATION CENTER, COTABATO CITY20MA0044 · ₱9,681,281.40 · mapped
- CONSTRUCTION OF SOLAR WATER SYSTEM, BULDON, MAGUINDANAO DEL NORTE23M00179 · ₱9,644,565.05 · mapped
- ROAD CONCRETING FROM BARANGAY MUTI TO BARANGAY AHAN, GUINDULUNGAN, MAGUINDANAO DEL SUR (1KM), STA. 0+000.00 - STA. 0+600.00, GUINDULUNGAN, MAGUINDANAO DEL SUR24M00323 · ₱9,628,607.07 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER) IN BARANGAY LIMPONGGO, DATU HOFFER AMPATUAN, MAGUINDANAO23M00126 · ₱6,811,179.06 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER) IN BARANGAY SALBU, DATU SAUDI AMPATUAN, MAGUINDANAO23M00130 · ₱6,811,175.97 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER), BARANGAY SAMBULAWAN, DATU SALIBO, MAGUINDANAO23M00211 · ₱6,685,992.52 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER), BARANGAY POBLACION, DATU PIANG, MAGUINDANAO23M00207 · ₱6,684,681.88 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER), BARANGAY ROMANGOB, SOUTH UPI, MAGUINDANAO23M00210 · ₱6,655,642.79 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER), BARANGAY POBLACION, PAGALUNGAN, MAGUINDANAO23M00208 · ₱6,597,979.85 · mapped
- CONCRETING OF BRGY. KITANGO-SITIO UDSUDAN FMR, BRGY. KITANGO, DATU SAUDI,MAGUINDANAO19MA0109 · ₱4,944,515.47 · mapped
- CONSTRUCTION OF ROAD, ACACIA STREET AND MOLAVE STREET, STA. 0+000 TO STA. 0+300, BRGY. ROSARY HEIGHTS XI, COTABATO CITY24M00237 · ₱4,932,635.71 · mapped
- COMPLETION OF MULTI-PURPOSE BUILDING, PENAFRANCIA, BRGY. ROSARY HEIGHTS XI, COTABATO CITY, MAGUINDANAO23M00184 · ₱4,918,106.74 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT WITH STAGE AND BLEACHERS) IN BARANGAY DAMALASAK, PAGALUNGAN, MAGUINDANAO23M00226 · ₱4,855,070.79 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION MARKET, BARIRA, MAGUINDANAO DEL NORTE23M00243 · ₱4,802,071.90 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) IN BARANGAY LIMPONGGO, DATU HOFFER AMPATUAN, MAGUINDANAO23M00195 · ₱4,760,277.66 · mapped
- REPAIR/REHABILITATION/IMPROVEMENT OF MULTI-PURPOSE BUILDING (HEADQUARTERS BUILDING, CAMP B/GEN. SALIPADA K. PENDATUN), PARANG, MAGUINDANAO20MA0073 · ₱4,439,239.06 · mapped
- ROAD FROM DATU BALABARAN BONSAIN FOOTBRIDGE, TAMONTAKA MOTHER NEAR THE SPECIAL ECONOMIC ZONE PASSING TO THE PROPOSED SEPTAGE TREATMENT PLANT FACILITY TO LEFT SIDE21M00075 · ₱4,260,927.22 · mapped
- CONSTRUCTION OF COVERED COURT, BRGY. ROMONGAUB, SOUTH UPI, MAGUINDANAO20MA0072 · ₱2,952,404.08 · mapped
- ROAD CONSTRUCTION/CONCRETING OF BRGY. MAKING, PARANG, MAGUINDANAO19MA0043 · ₱2,938,602.31 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. POBLACION, PARANG, MAGUINDANAO20MA0009 · ₱2,449,311.71 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. AMBOLODTO, DATU ODIN SINSUAT, MAGUINDANAO19MA0022 · ₱1,952,098.53 · mapped
- ROAD CONSTRUCTION / CONCRETING OF BARANGAY POBLACION 2, PARANG, MAGUINDANAO19MA0086 · ₱1,940,128.96 · mapped
