CRISHELLE CONST is listed as a company organization in Philippine public procurement records on this site, with 69 linked DPWH project(s) totaling about ₱502,387,796.65. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
CRISHELLE CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 69
- Total value
- ₱502,387,796.65
- Published flags
- 0
- Region
- Palawan 2nd DEO · Region IV-B
Public Record Grade
A transparent, data-derived summary of reported public records for CRISHELLE CONST — not an accusation or finding of wrongdoing.
Score: 88.20 / 100 · Projects in sample: 69 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 82.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 82.6
- lateCompletedProjects
- 24
- onTimeCompletedProjects
- 45
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 69
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 69
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 69
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 69
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 69
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 34 of 44 geotagged projects (largest by contract value) — Open full map
- ROAD CONCRETING - POBLACION TO OLD SITE IN BRGY. SAN JUAN IN SUPPORT OF SEAWEEDS AND FISHING INDUSTRY, STA. 000+000 - STA. 002+520, BRGY. SAN JUAN, ABORLAN, PALAWAN18EG0090 · ₱56,344,139.95 · mapped
- REHABILITATION OF DAMAGED PAVED ROAD PUERTO PRINCESA SOUTH RD. - K0133+070-K0133+255, K0133+268-K0135+072.50, K0135+247-K0135+327, SOFRONIO ESPAÑOLA, PALAWAN20EF0024 · ₱39,205,484.34 · mapped
- CONSTRUCTION OF ROAD, SITIO COMMUNAL MULTI-PURPOSE COOPERATIVE ROAD CONNECTING BARANGAY ROAD OF IRAAN IN SUPPORT OF OIL PALM INDUSTRY, STATION 00+000 - 01+090, IRAAN, ABORLAN, PALAWAN23EG0033 · ₱32,968,176.81 · mapped
- ROAD WIDENING-PALAWAN CIRCUM. RD. K0271+780-K0273+017, BATARAZA, PALAWAN22EF0021 · ₱31,984,061.10 · mapped
- ROAD WIDENING PPSR JCT-POBLACION BROOKE'S POINT ROAD, K0190+(-050)-K0191+535, BROOKE'S POINT, PALAWAN22EF0048 · ₱26,908,723.77 · mapped
- CONSTRUCTION OF DUMANGUEÑA ROAD (PHASE 2), BRGY. DUMANGUEÑA, NARRA, PALAWAN22EF0045 · ₱23,028,624.60 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PUERTO PRINCESA SOUTH ROAD, K0030 + 126 - K0030 + 657, K0030 + 748 - K0031 + 180, PUERTO PRINCESA CITY, PALAWAN20EG0065 · ₱22,382,802.93 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, QUEZON-ARAMAYWAN ROAD (S00015PW), K0146+-150-K0147+423, K0147+470-K0148+760, QUEZON, PALAWAN17EF0006 · ₱19,599,898.83 · mapped
- CONCRETING OF TUBTUB-AMAS ROAD, BROOKE'S POINT, PALAWAN21EF0024 · ₱18,618,711.69 · mapped
- REHAB./RECONST./UPGRADING OF DAMAGED PAVED NAT'L. RDS. PPSR, K0095+793-K0096+174;K0144+000-K0144+31316EF0025 · ₱14,843,248.75 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO PUNANG CHRISTIAN MUSLIM NATIVE ROAD CONNECTING BARANGAY ROAD OF PUNANG IN SUPPORT OF OIL PALM INDUSTRY, SOFRONIO ESPAÑOLA, PALAWAN20EF0067 · ₱14,699,383.77 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO MALALONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNANG CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPAÑOLA, PALAWAN20EF0068 · ₱14,564,429.31 · mapped
- RETROFITTING OF PERMANENT BRIDGES BURIRAO BR. (BOO359PW) ALONG PUERTO PRINCESA SOUTH RD. NARRA, PALAWAN20EF0064 · ₱14,553,191.10 · mapped
- CONCRETING OF PUROK BAGONG SIGLA TO PUROK BLISS, BRGY. PANACAN II, NARRA, PALAWAN20EF0139 · ₱9,692,125.20 · mapped
- CONCRETING OF ROAD FROM SOPAD BRIDGE TO DELTA FALLS, ELVITA, NARRA, PALAWAN21EF0095 · ₱8,954,853.53 · mapped
- CONSTRUCTION OF 2-STOREY LEGISLATIVE BUILDING BRGY. ALFONSO XIII, QUEZON, PALAWAN20EF0098 · ₱8,926,026.47 · mapped
- CONSTRUCTION OF LOCAL ROAD AT BARANGAY CABIGAAN, STA. 0+000.00 - STA. 0+426.00, ABORLAN, PALAWAN24EG0042 · ₱7,919,907.37 · mapped
- CLUSTER 15-1. CONST. OF CLASSROOM: BONO-BONO ES 1STY3CL. 2. CONST. OF CLASSROOM: BULILUYAN ES 1STY2CL., BATARAZA, PALAWAN17EF0098 · ₱6,391,776.47
- CONST. OF CLASSROOMS: BATARAZA NATIONAL HGIH SCHOOL 2 UNIT 1CL. TVL-UW, BATARAZA, PALAWAN17EF0151 · ₱6,343,813.99
- CONCRETING OF BRGY. ROAD, BRGY MALINAO, NARRA, PALAWAN21EF0100 · ₱6,326,072.20 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY IRAWAN, PUERTO PRINCESA CITY, PALAWAN24EG0007 · ₱5,444,827.22 · mapped
- CONST. OF 2 SHS UNIQUE WORKSHOP, SANDOVAL NATIONAL HIGH SCHOOL, NARRA, PALAWAN16EF0065 · ₱5,258,962.02
- CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) - RAINWATER COLLECTOR IN PUBLIC FACILITIES, DPWH SAN RAFAEL RESTHOUSE, INAGAWAN NATIONAL H/S, INAGAWAN NATIONAL H/S-TAGBARUNGIS ANNEX SCHOOL, INAGAWAN E/S, MANGINGISDA WEST E/S, PLARIDEL E/S, PLARIDEL H/S,22EG0097 · ₱4,371,646.40 · mapped
- CONST. OF CLASSROOM: DIGNUZON PS 1STY3CL, RIZAL(MARCOS), PALAWAN17EF0108 · ₱3,979,287.96
- CONSTRUCTION OF PANACAN II FLOOD CONTROL, BARANGAY PANACAN II, NARRA, PALAWAN19EF0132 · ₱3,880,800.00 · mapped
- CONSTRUCTION OF RAINWATER COLLECTORS, MORZON P/S, CULANDANUM NHS, TINA E/S, BUBUSAWIN E/S, SANTO NIÑO E/S, ABORLAN, KANDES E/S, MARANAT E/S, BACUNGAN BARANGAY HALL, BACUNGAN E/S, SALVACION BARANGAY HALL, SALVACION E/S, UBALDO L. CONDE HS, LANGOGAN NHS, BU20EG0084 · ₱3,824,141.40 · mapped
- CONST. OF CLASSROOM: CANIPAAN ES EXTENSION 1STY3CL, RIZAL(MARCOS), PALAWAN17EF0106 · ₱3,818,585.17
- CONCRETING OF PUROK MAGSASAKA FMR, BRGY. MALINAO, NARRA, PALAWAN16EF0083 · ₱3,717,685.08
- CONST. OF MULTI-PURPOSE BUILDING, BRGY. ANTIPULUAN, NARRA, PALAWAN22EF0012 · ₱3,622,707.00 · mapped
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), MORZON P/S, ABORLAN; DPWH-PALAWAN AREA EQUIPMENT SECTION CANTEEN, LABTAY E/S, NAPSAN NHS, DON ROCES MES, BAHIL;E E/S, BAHILE NHS-SENIOR HIGH SCHOOL BUILDING, MACARASCAS E/S, BUENAVISTA E/S, TAGABINET E/S19EG0121 · ₱3,562,855.00 · mapped
- CONCRETING OF SO. LINAMEN BRGY. CAGUISAN TO BGY BATANG-BATANG PROPER FMR, NARRA, PALAWAN16EF0082 · ₱3,468,816.39
- ROAD CONSTRUCTION AT BARANGAY MAGBABADIL, STATION 00+000.00 - 00+346, MUNICIPALITY OF ABORLAN, PALAWAN22EG0002 · ₱3,354,157.97 · mapped
- CONST. OF CLASSROOMS: SUMBILING NATIONAL HGIH SCHOOL 1CL TVL-RW, BATARAZA, PALAWAN17EF0154 · ₱3,281,176.78
- CONST. OF CLASSROOM: TARUSAN NATIONAL HIGH SCHOOL 1CL TVL-UW, BATARAZA, PALAWAN17EF0134 · ₱3,184,239.51
- CONST. OF CLASSROOM: MAASIN NATIONAL HIGH SCHOOL (BERNAS NHS) 1CL TVL-UW, BROOKES' POINT, PALAWAN17EF0131 · ₱3,181,779.51
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), APURAWAN HNS, APOC-APOC ES, JOSE RIZAL-APOC-APOC NHS, ABORLAN NHS, SANTO NINO ES, CABIGAAN NHS, CULANDANUM NHS, ABORLAN; LUCBUAN ES, MARCELINO A. JAVAREZ NHS, FRANCISCO AUSTRIA MES, NAPSAN NHS,18EG0105 · ₱3,172,055.60 · mapped
- CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) JOSE RIZAL E/S, APLAYA E/S, TAGPAIT E/S, TIGMAN E/S, GOGOGNAN E/S, ABORLAN; DPWH-RESTHOUSE BRGY. SAN RAFAEL, MABUHAY E/S, TAGUMPAY E/S, TALAUDYONG E/S, IRATAG E/S, MATAHIMIK-BUCANA E/S, LUZVIMINDA NHS17EG0090 · ₱3,094,821.79 · mapped
- CONCRETING OF INAGAWAN-SUB FMR, STA. 1+227.50 - STA. 1+427.50, STA. 1+956.10 - STA. 2+166.00, BARANGAY INAGAWAN, PUERTO PRINCESA CITY16EG0076 · ₱2,959,817.25
- REHAB/MAJOR REPAIR OF PARIAN BR. 2 (B00043PW)17EF0013 · ₱2,930,319.19 · mapped
- CONST./REHAB. OF WATER SUPPLY/SEPTAGE/RAINWATER COLLECTOR SYSTEM, SITIO GUMARONGGONG, BRGY PANALINGAAN, RIZAL, PALAWAN17EF0173 · ₱2,851,458.56 · mapped
- CONST./REHAB. OF WATER SUPPLY/SEPTAGE/RAINWATER COLLECTOR SYSTEM, SITIO SALONGSONG II, BRGY, IRAAN, RIZAL, PALAWAN17EF0172 · ₱2,851,458.56 · mapped
- CONST. OF 1 SHS UNIQUE WORKSHOP, GOV. ALFREDO ABUEG SR. NATIONAL TECHNOLOGY & VOCATIONAL MEMORIAL HIGH SCHOOL, BROOKE'S POINT, PALAWAN16EF0070 · ₱2,758,976.80
- CONST. OF 1 SHS UNIQUE WORKSHOP, CANIPAAN NHS, RIZAL (MARCOS), PALAWAN16EF0076 · ₱2,758,901.38
- CONST. OF TWO CLASSROOM SCHOOL BUILDING IN PALAWAN STATE UNIVERSITY, BATARAZA, PALAWAN21EF0007 · ₱2,748,812.15 · mapped
- CONST. OF 1 SHS UNIQUE WORKSHOP, ARAMAYWAN NHS, NARRA, PALAWAN16EF0069 · ₱2,626,590.90
- CONST. OF CLASSROOM: BULNO PS 1STY2CL, RIZAL (MARCOS), PALAWAN17EF0105 · ₱2,614,480.83
- CONST. OF CLASSROOM: PANGATBAN PRIMARY SCHOOL 1STY2CL., SOFRONIO ESPAÑOLA, PALAWAN17EF0114 · ₱2,563,473.25
- CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS) - RAINWATER COLLECTOR IN PUBLIC FACILITIES, LANGOGAN NHS, PUERTO PRINCESA CITY NATIONAL SCIENCE HIGH SCHOOL, IRATAG E/S, BACUNGAN NHS AND BUSNGOL E/S, PUERTO PRINCESA CITY22EG0094 · ₱2,158,494.42 · mapped
- CONSTRUCTION OF 2 CLASSROOMS BUILDING, MARCELO BANTOG, NATIONAL HIGH SCHOOL, BRGY. SAN JUAN, ABORLAN, PALAWAN18EG0052 · ₱1,917,772.49 · mapped
- REHAB/MAJOR REPAIR OF CALATUBOG BR. (B00053PW) ALONG PPSR, NARRA, PALAWAN16EF0040 · ₱1,910,086.14 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
