ZAMBOPEN CONST is listed as a company organization in Philippine public procurement records on this site, with 14 linked DPWH project(s) totaling about ₱102,475,429.07. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
ZAMBOPEN CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 14
- Total value
- ₱102,475,429.07
- Published flags
- 0
- Region
- Zamboanga City 2nd DEO · Region IX
Online presence
Google Maps: Zambopen Construction★ 5 (1 reviews)Google Maps, 2026-10-22
W34F+Q3C, 30 Melaño Calixto St, Zamboanga City, 7000 Zamboanga del Sur
Licensed officers (PCAB)
- JESUS JAYSON SAAVEDRA · Authorized Managing Officer (PCAB license 33831) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ZAMBOPEN CONST — not an accusation or finding of wrongdoing.
Score: 86.40 / 100 · Projects in sample: 14 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 96.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 96.4
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 13
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 14
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 14
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 1.9
- componentScore
- 100
- projectsWithAbcAndCost
- 14
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 14
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 14
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
14 geotagged projects — Open full map
- WIDENING OF PERMANENT BRIDGES MALA BRIDGE (B00567MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD19JA0035 · ₱17,790,880.21 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS : AIRPORT ROAD INCL. ROW - (S01208MN) - CHAINAGE 000 - CHAINAGE 493, CHAINAGE 000 - 49318JA0004 · ₱16,720,020.74 · mapped
- CONCRETING OF KM 10 - CABONEGRO, BRGY. LA PAZ FMR, BRGY. LA PAZ, ZAMBOANGA CITY21JA0135 · ₱11,939,595.72 · mapped
- CONSTRUCTION OF ACCESS ROAD W/ DRAINAGE, LT ELUM AIR STATION, HILL 900, ZAMBOANGA CITY22JA0031 · ₱11,909,244.67 · mapped
- CONSTRUCTION OF WATER SYSTEM LEVEL II (WATER WORKS) DULIAN - CABATANGAN, ZAMBOANGA CITY ROAD19JA0078 · ₱7,509,820.03 · mapped
- CONCRETING OF BRGY. CAPISAN FMR, BRGY. CAPISAN, ZAMBOANGA CITY18JA0106 · ₱6,591,325.75 · mapped
- LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONST./ REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: CONCRETING OF CABATANGAN ROAD, CABATANGAN, ZAMBOANGA CITY18JA0096 · ₱5,168,235.51 · mapped
- CONCRETING OF LOCAL ROAD AT SITIO STO. NIÑO SINUNUC, BARANGAY SINUNUC, ZAMBOANGA CITY16JA0038 · ₱4,879,270.15 · mapped
- LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/ FACILITIESCONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. LIGTONG I, ROSARIO AND CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. KAINGEN, KAWIT, CAVITE21DF0171 · ₱3,960,000.00 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY TUGBUNGAN, ZAMBOANGA CITY21JA0060 · ₱3,954,312.24 · mapped
- ROAD OPENING AT SITIO CABONEGRO-LIMPAPA, BARANGAY LIMPAPA, ZAMBOANGA CITY MODIFIED TO ROAD OPENING AT MASALAG-LACUMBA, BARANGAY LIMPAPA, ZAMBOANGA CITY16JA0035 · ₱3,850,613.42 · mapped
- ROAD OPENING OF LOCAL ROAD AT SINUBONG TO MOUNTAIN VIEW, SINUBONG, ZAMBOANGA CITY16JA0065 · ₱3,850,010.84 · mapped
- CONCRETING OF LUMAYANG FMR, BARANGAY LUMAYANG, ZAMBOANGA CITY16JA0096 · ₱2,960,593.87 · mapped
- CONCRETING OF ROAD, BRGY. LUMAYANG, ZAMBOANGA CITY18JA0082 · ₱1,391,505.92 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
