ZERO ONE CONST AND TRADING INC is listed as a company organization in Philippine public procurement records on this site, with 47 linked DPWH project(s) totaling about ₱834,888,585.87. Recorded delivery grade F (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
ZERO ONE CONST AND TRADING INC
FRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 47
- Total value
- ₱834,888,585.87
- Published flags
- 0
- Region
- Las Piñas-Muntinlupa DEO · National Capital Region
Online presence
Google Maps: Zero to One Construction Corporation★ 5 (2 reviews)Google Maps, 2026-10-22
Emannuel SJB, Manila S Rd, Cabuyao City, 4025 Laguna
Licensed officers (PCAB)
- JOSHUA JOHN LUZ LOPEZ · Authorized Managing Officer (PCAB license 54208) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ZERO ONE CONST AND TRADING INC — not an accusation or finding of wrongdoing.
Score: 56.90 / 100 · Projects in sample: 47 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 10.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 10.7
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 6
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 31
- pastTargetOngoingProjects
- 25
- undatedCompletedProjectsExcluded
- 16
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 47
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 47
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
46 geotagged project(s) — Open full map
- CONSTRUCTION OF ROAD CONNECTING BACOOR-DASMARINAS NATIONAL ROAD-SAN MARINO RD., DASMARINAS, CAVITE (PHASE 1) AND CONSTRUCTION OF ROAD CONNECTING BACOOR-DASMARIÑAS NATIONAL ROAD-SAN MARINO RD., DASMARIÑAS, CAVITE (PHASE 2)24DQ0069 · ₱98,998,789.31 · mapped
- CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER, BARANGAY MABUHAY TO BARANGAY LANTIC, PHASE 1, CARMONA CITY, CAVITE25DQ0081 · ₱93,701,476.96 · mapped
- REHABILITATION OF C5 EXTENSION (EAST AND WEST BOUND), LAS PINAS CITY25OI0002 · ₱65,460,572.56 · mapped
- CONSTRUCTION OF ROAD CONNECTING CONGRESSIONAL AVENUE AND SAN MARINO ROAD, DASMARIÑAS, CAVITE25DQ0098 · ₱48,014,932.08 · mapped
- CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BARANGAY BIGA 1 AND SABUTAN, PHASE 4, SILANG, CAVITE25DQ0079 · ₱47,578,925.17
- CONCRETING OF BRGY. SAMPALOC 2 FMR, BRGY. SAMPALOC 2, DASMARIÑAS CITY, CAVITE24DQ0100 · ₱29,551,443.32 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY TALON 1, LAS PINAS CITY25OI0027 · ₱28,957,451.42 · mapped
- CONSTRUCTION OF CARMONA - SILANG DIVERSION ROAD, CAVITE24D00206 · ₱24,124,980.30 · mapped
- PREVENTIVE MAINTENANCE - TERTIARY ROADS: MARCOS ALVAREZ RD K0022+065 - K0022+625, LAS PINAS CITY24OI0001 · ₱22,937,873.18 · mapped
- CONSTRUCTION OF MULTI - PURPOSE FACILITIES AND OTHER IMPROVEMENTS AT BARANGAY TALON 1, LAS PINAS CITY25OI0103 · ₱20,375,037.33 · mapped
- CONSTRUCTION ROAD SLOPE PROTECTION, PULANGLUPA I, LAS PINAS CITY23OI0090 · ₱19,575,628.60 · mapped
- REHABILITATION OF ROAD INCLUDING DRAINAGE SYSTEM, BARANGAY TALON 3, LAS PINAS CITY24OI0125 · ₱19,403,917.12 · mapped
- CONSTRUCTION OF ROAD AT PHILFIDA AND AUDINASIUM COMPOUND IN BRGY. TALON DOS, LAS PINAS CITY23OI0082 · ₱18,884,282.46 · mapped
- REHABILITATION OF ROAD, BARANGAY TALON 3 (PHASE 2), LAS PINAS CITY24OI0046 · ₱18,619,537.34 · mapped
- REHABILITATION OF ROAD, BARANGAY TALON 4 (PHASE 2), LAS PINAS CITY24OI0028 · ₱18,619,271.13 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS: ZAPOTE - ALABANG RD, K0018+260 - K0018+487, LAS PINAS CITY25OI0005 · ₱18,246,656.60 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TALON 3, LAS PINAS CITY25OI0048 · ₱17,552,500.86 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE, BRGY. ALMANZA 1, LAS PINAS CITY24OI0090 · ₱14,106,899.97 · mapped
- CONSTRUCTION OF MULTI - PURPOSE FACILITIES AND OTHER IMPROVEMENTS AT BARANGAY TALON 5, LAS PINAS CITY25OI0111 · ₱13,503,893.62 · mapped
- REHABILITATION OF MULTI-PURPOSE BLDG., MANUYO 2, LAS PINAS CITY LONE DISTRICT PHASE 225OI0096 · ₱10,672,457.02 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS: ZAPOTE - ALABANG RD, K0016+232.71 - K0016+371.20, LAS PINAS CITY24OI0008 · ₱10,292,157.41 · mapped
- REHABILITATION OF ROAD INCLUDING DRAINAGE, PILAR, LAS PINAS CITY23OI0102 · ₱9,794,071.85 · mapped
- REHABILITATION OF MULTI - PURPOSE BUILDING, BARANGAY TALON 4, LAS PINAS CITY24OI0129 · ₱9,751,652.50 · mapped
- REHABILITATION OF MULTI - PURPOSE BUILDING, BARANGAY PULANGLUPA 1, LAS PINAS CITY25OI0056 · ₱9,751,469.59 · mapped
- REHABILITATION OF MULTI PURPOSE BUILDING (TALON 3 BARANGAY HALL), BRGY. TALON 3, LAS PINAS CITY24OI0149 · ₱9,751,334.55 · mapped
- REHABILITATION OF MULTI PURPOSE BLDG., PAMPLONA 3, LAS PINAS CITY LONE DISTRICT24OI0148 · ₱9,750,837.92 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BLDG., TALON 4 LAS PINAS CITY23OI0086 · ₱9,505,854.99 · mapped
- REHABILITATION OF MULTI - PURPOSE BUILDING, BARANGAY PAMPLONA 3, LAS PINAS CITY25OI0024 · ₱7,800,961.70 · mapped
- REHABILITATION OF MULTI-PURPOSE BLDG., TALON 4, LAS PINAS CITY LONE DISTRICT25OI0062 · ₱7,761,598.62 · mapped
- CONSTRUCTION OF ROAD, BATIBOT-DELA CRUZ, BRGY. PAMPLONA 3, LAS PINAS CITY24OI0158 · ₱7,721,626.88 · mapped
- REHABILITATION OF ROAD, BARANGAY TALON 4, LAS PINAS CITY24OI0019 · ₱7,447,693.66 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING, GATCHALIAN PH 8C, AT BRGY. MANUYO 2, LAS PINAS CITY24OI0119 · ₱6,826,023.35 · mapped
- CONSTRUCTION OF MULTI PURPOSE BLDG., BRGY. PAMPLONA 3, LAS PINAS CITY PHASE 124OI0124 · ₱6,825,472.10 · mapped
- CONSTRUCTION OF BOX CULVERT AT BARANGAY TALON 4, LAS PINAS CITY25OI0094 · ₱6,791,406.95 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, VERDANT ACRES, BRGY. PAMPLONA 3, LAS PINAS CITY24OI0099 · ₱6,722,052.59 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (BESIDE CAA HIGHSCHOOL), BRGY. CAA, LAS PINAS CITY24OI0080 · ₱6,722,011.61 · mapped
- REHABILITATION OF ROAD INCLUDING DRAINAGE AT BRGY. PAMPLONA 3, LAS PINAS CITY24OI0101 · ₱6,584,784.16 · mapped
- REHABILITATION OF DRAINAGE & ROAD, BRGY. MANUYO 2, LAS PINAS CITY24OI0102 · ₱6,583,495.22 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING, REGENCY 1 BRGY. MANUYO 2, LAS PINAS CITY24OI0079 · ₱5,761,782.56 · mapped
- REHABILITATION OF DRAINAGE SYSTEM, BERNABE, BRGY. PULANGLUPA 1, LAS PINAS CITY24OI0093 · ₱5,642,215.48 · mapped
- CONSTRUCTION / REHABILITATION OF MULTI PURPOSE BLDG., TALON 3, LAS PINAS CITY23OI0088 · ₱4,895,172.10 · mapped
- REHABILITATION OF MULTI - PURPOSE BUILDING, BARANGAY TALON 3, LAS PINAS CITY25OI0020 · ₱4,875,765.73 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING INCLUDING GROUND IMPROVEMENT, MANUYO 2, LAS PINAS CITY LONE DISTRICT24OI0120 · ₱4,874,807.91 · mapped
- COMPLETION OF MULTI PURPOSE BLDG., CAA, LAS PINAS CITY LONE DISTRIC25OI0058 · ₱4,850,431.82 · mapped
- REHABILITATION (COMPLETION) OF MULTI - PURPOSE BUILDING, BRGY. TALON 4, LAS PINAS CITY24OI0137 · ₱2,925,444.66 · mapped
- REHABILITATION OF MULTI-PURPOSE FACILITIES INCLUDING OTHER IMPROVEMENTS AT BARANGAY TALON 3, LAS PINAS CITY25OI0109 · ₱2,910,572.65 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS; ZAPOTE - ALABANG RD, K0019+228 - K0019+262.07, LAS PINAS CITY24OI0007 · ₱2,881,360.96 · mapped
