CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BARANGAY BIGA 1 AND SABUTAN, PHASE 4, SILANG, CAVITE
CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BARANGAY BIGA 1 AND SABUTAN, PHASE 4, SILANG, CAVITE is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱47,578,925.17. Status: Past target date (DPWH On-Going). Contractor on record: ZERO ONE CONST AND TRADING INC. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
