A D L CONSTRAK OPC FORMERLY: A D L CONSTRAK is listed as a company organization in Philippine public procurement records on this site, with 47 linked DPWH project(s) totaling about ₱389,016,193.49. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
A D L CONSTRAK OPC FORMERLY: A D L CONSTRAK
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 47
- Total value
- ₱389,016,193.49
- Published flags
- 0
- Region
- Southern Mindoro DEO · Region IV-B
Online presence
Google Maps: A.D.L. ConstrakGoogle Maps, 2026-10-22
FGY Street, Sta. Fe, Poblacion, Roxas, Oriental Mindoro, HFXM+QFJ, Roxas, Oriental Mindoro
Public Record Grade
A transparent, data-derived summary of reported public records for A D L CONSTRAK OPC FORMERLY: A D L CONSTRAK — not an accusation or finding of wrongdoing.
Score: 92.00 / 100 · Projects in sample: 47 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 93.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 93.8
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 44
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 47
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 47
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 47
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 47
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
35 geotagged projects — Open full map
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BONGABONG, ORIENTAL MINDORO21EI0138 · ₱35,279,887.10 · mapped
- CONSTRUCTION OF EVACUATION CENTER, BARANGAY POBLACION, BULALACAO, ORIENTAL MINDORO20EI0181 · ₱34,739,949.20 · mapped
- CONSTRUCTION OF MULTI- PURPOSE BUILDING (BALAY KALINGA), BANSUD, ORIENTAL MINDORO24EI0099 · ₱29,690,632.41 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - CALAPAN SOUTH RD - K0168+345 - K0168+417, BULALACAO, ORIENTAL MINDORO25EI0002 · ₱23,370,559.34 · mapped
- CONSTRUCTION OF THREE STOREY TWELVE CLASSROOM SCHOOL BUILDING (3 STY 12 CL) @ SAN MARIANO NHS, ROXAS, ORIENTAL MINDORO17EI0090 · ₱19,344,593.48
- CONSTRUCTION-MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN MARIANO RIVER CONTROL, MADUGO RIVER, ROXAS, ORIENTAL MINDORO19EI0085 · ₱18,639,387.81 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROAD - CALAPAN SOUTH RD - K0187+380 - K0187+501.6, BULALACAO, ORIENTAL MINDORO22EI0016 · ₱17,629,038.44 · mapped
- ROAD WIDENING - SECONDARY ROADS - MINDORO ORIENTAL/OCCIDENTAL EAST COASTAL RD - K0188 + 010 - K0188 + 769, BULALACAO, ORIENTAL MINDORO21EI0015 · ₱13,816,977.64 · mapped
- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS,CSR (K0119+080-K0119+114.80), BONGABONG, ORIENTAL MINDORO20EI0115 · ₱13,582,398.58 · mapped
- ROAD WIDENING - SECONDARY ROAD - CALAPAN SOUTH ROAD - K0158+770 - K0159+012, K0159+187 - K0159+379, MANSALAY, ORIENTAL MINDORO23EI0015 · ₱13,213,013.11 · mapped
- CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROADS CSR (K0127+400 - K0127+560, K0164+978 - K0165+170, K0168+940 - K0169+086, K0171+184 - K0171+422 & K0171+845 - K0172+242), BONGABONG, MANSALAY, BULALACAO, ORIENTAL MINDORO17EI0047 · ₱12,712,590.21 · mapped
- REPAIR/REHABILITATION/RECONSTRUCTION OF TAGUMPAY RIVER CONTROL, NAUJAN, ORIENTAL MINDORO18ED0194 · ₱12,687,482.34 · mapped
- REHABILITATION/RECONSTRUCTION OF DAMAGED PAVED ROADS ALONG CALAPAN SOUTH ROAD, K0102+550 - K0103+000, BONGABONG, ORIENTAL MINDORO18EI0023 · ₱11,464,673.50 · mapped
- CONSTRUCTION OF MULTI- PURPOSE BUILDING (CLASSROOM), CACAWAN HIGH SCHOOL, BRGY. CACAWAN, PINAMALAYAN, ORIENTAL MINDORO24EI0101 · ₱9,897,996.03 · mapped
- CONSTRUCTION-CONCRETING OF SAN JOSE PROPER SITIO BAL-ONG, SAN JOSE, ROXAS, ORIENTAL MINDORO19EI0041 · ₱9,799,185.27 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURES, CONSTRUCTION OF FLOOD CONTROL BAROC RIVER, MANSALAY, ORIENTAL MINDORO17EI0086 · ₱9,335,828.70 · mapped
- CONSTRUCTION OF TWO STOREY SIX CLASSROOM (2 STY 6 CL) @ CAWAYAN NHS, BONGABONG, ORIENTAL MINDORO17EI0075 · ₱8,130,234.25
- CONSTRUCTION OF TWO STOREY SIX CLASSROOM SCHOOL BUILDING (2 STY 6 CL) @ PAG - ASA NHS, BANSUD, ORIENTAL MINDORO17EI0078 · ₱8,130,218.62
- CONSTRUCTION OF 1 UNIT - ONE STOREY TWO CLASSROOM AND 1 UNIT - ONE STOREY THREE CLASSROOM SCHOOL BUILDING (1 STY 2 CL & 1 STY 3 CL) @ ROXAS CS, ROXAS, ORIENTAL MINDORO17EI0162 · ₱6,718,625.93
- CONSTRUCTION OF TWO STOREY FOUR CLASSROOM SCHOOL BUILDING (2 STY 4 CL) @ FELIMON M, SALCEDO SR. MNHS, BANSUD, ORIENTAL MINDORO17EI0074 · ₱6,253,570.76
- ROAD WIDENING - SECONDARY ROADS - CALAPAN SOUTH ROAD - K0150+681 - K0150+775, K0151+011 - K0151+074, MANSALAY, ORIENTAL MINDORO24EI0009 · ₱5,828,901.86 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING AT BARANGAY MILAGROSA, BULALACAO, ORIENTAL MINDORO23EI0112 · ₱4,824,970.41 · mapped
- CONSTRUCTION OF PROPER SAN VICENTE - TAGASKAN FMR, BRGY. SAN VICENTE, ROXAS, ORIENTAL MINDORO17EI0083 · ₱4,820,733.67
- CONCRETING OF PROPER TIGUISAN FARM TO MARKET ROAD, BANSUD, ORIENTAL MINDORO16EI0043 · ₱4,741,673.32
- COMPLETION OF SCHOOL BUILDING (2 STY 6 CL) @ PAG-ASA NHS, BANSUD, ORIENTAL MINDORO18EI0154 · ₱3,877,501.35 · mapped
- REHABILITATION/RECONSTRUCTION OF PACLASAN SEAWALL, ROXAS, ORIENTAL MINDORO16EI0054 · ₱3,626,751.76
- CONCRETING OF IPIL - SAGANA BRIDGE APPROACHES A & B AND BRGY. STA.CRUZ ROAD, BRGY. IPIL AND SAGANA AND STA. CRUZ, BONGABONG, ORIENTAL MINDORO16EI0023 · ₱3,290,754.85
- CONSTRUCTION OF COVERED COURT, BRGY. SAN ROQUE, BULALACAO, ORIENTAL MINDORO18EI0021 · ₱2,948,484.41 · mapped
- CONCRETING OF BRGY. STA. CRUZ ROAD, BRGY. LISAP ROAD ABD BRGY. MORENTE ROAD, BONGABONG, ORIENTAL MINDORO17EI0026 · ₱2,910,119.01
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT), BARANGAY SAN JUAN, BULALACAO, ORIENTAL MINDORO19EI0142 · ₱2,904,896.54 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT), BRGY. CAMANTIGUE, BONGABONG, ORIENTAL MINDORO19EI0115 · ₱2,879,613.98 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT), BARANGAY BENLI, BULALACAO, ORIENTAL MINDORO19EI0001 · ₱2,875,208.77 · mapped
- CONSTRUCTION OF MULTI - PURPOSE BUILDING (COVERED COURT), BARANGAY ODIONG, ROXAS, ORIENTAL MINDORO19EI0136 · ₱2,870,706.85 · mapped
- CONSTRUCTION OF BRGY. BAGUMBAYAN COVERED COURT, ROXAS, ORIENTAL MINDORO18EI0063 · ₱2,857,938.48 · mapped
- CONSTRUCTION OF BRGY. MARFRANCISCO COVERED COURT, PINAMALAYAN, ORIENTAL MINDORO18EI0064 · ₱2,851,592.61 · mapped
- CONSTRUCTION OF ONE STOREY TWO CLASSROOM SCHOOL BUILDING (1 STY 2 CL) @ FELISA GUEVARRA SALVACION MES, BONGABONG, ORIENTAL MINDORO17EI0130 · ₱2,836,622.81
- CONSTRUCTION OF SHS UNIQUE WORKSHOP @ CAWAYAN NHS, BONGABONG, ORIENTAL MINDORO16EI0047 · ₱2,508,447.13
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD - CALAPAN SOUTH ROAD - K0126+690 - K0126+900, BONGABONG, ORIENTAL MINDORO20EI0012 · ₱2,179,958.26 · mapped
- CONCRETING OF BATANGAN ROAD, BONGABONG, ORIENTAL MINDORO18EI0046 · ₱1,953,296.38 · mapped
- CONSTRUCTION OF ROAD AT BARANGAY SALCEDO,BANSUD, ORIENTAL MINDORO21EI0067 · ₱1,914,034.49 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, QUINABIGAN BR. (B00035MR) ALONG CSI, PINAMALAYAN, OR. MINDORO17EI0017 · ₱1,913,997.11 · mapped
- REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, MALITBOG BRIDGE, BONGABONG, OR. MINDORO16EI0014 · ₱1,891,286.11 · mapped
- REPAIR/REHABILITATION OF MPB (COVERED COURT), CAMANTIGUE, BONGABONG, ORIENTAL MINDORO19EI0150 · ₱1,881,097.52 · mapped
- CONSTRUCTION (IMPROVEMENT) OF MULTI - PURPOSE BUILDING AT BARANGAY PANAYTAYAN, MANSALAY, ORIENTAL MINDORO21EI0071 · ₱999,933.92 · mapped
- REHAB./MAJOR REPAIR OF PERMANENT BRIDGES, BATANGAN BRIDGE, BONGABONG, OR. MINDORO16EI0015 · ₱945,480.24 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, CAWACAT BR. (B00074MR), ALONG CSR, BULALACAO, ORIENTAL MINDORO16EI0019 · ₱945,379.89 · mapped
- IMPROVEMENT OF MPB AND OTHER BARANGAY FACILITIES, BRGY. VILLA PAG ASA, BANSUD, ORIENTAL MINDORO20EI0132 · ₱499,969.04 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
