E P MANANTAN CONST is listed as a company organization in Philippine public procurement records on this site, with 92 linked DPWH project(s) totaling about ₱951,962,165.79. No delivery grade published yet (insufficient linked public records).
E P MANANTAN CONST
N/GGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 92
- Total value
- ₱951,962,165.79
- Published flags
- 0
- Region
- Davao de Oro 1st DEO · Region XI
Online presence
Google Maps: EP Manantan Const. and Dev't Corp.★ 5 (1 reviews)Google Maps, 2026-10-22
CRQ4+G28 Rabe Subdivision, Tagum, Davao del Norte
Public Record Grade
A transparent, data-derived summary of reported public records for E P MANANTAN CONST — not an accusation or finding of wrongdoing.
Not graded yet — the Public Record Grade has not been computed for this contractor.
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 90 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION CONCRETE ROAD JCT. AGUSAN-DAVAO ROAD, BRGY. CANOCOTAN TO JCT. SURIGAO DAVAO COASTAL ROAD LEADING TO BANANA BEACH, LANIKAI BEACH RESORT & HIJO PORT ( BRIDGE REHABILITATION) TAGUM CITY, DAVAO DEL NORTE18LC0031 · ₱50,442,476.60 · mapped
- KAPALONG - TALAINGOD - VALENCIA (BUKIDNON) ROAD K1522+340 - K1522+403, K1528+180 - K1528+300, DAVAO DEL NORTE22LC0008 · ₱49,000,000.00 · mapped
- KIPALICO BR.(B00191MN) ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD22LC0029 · ₱47,999,999.98 · mapped
- REHAB/RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE ALONG DAVAO ORIENTAL COASTAL ROAD K1531+475 TO K1531+525, K 1576+398 TO K1576+641, K1521+849 TO K1522+097, K1562+487 TO K1563+000 AND K1601+670 TO K1602+000, DVO. OR. IST DISTRICT17LF0017 · ₱43,833,408.40 · mapped
- CONSTRUCTION OF PEDESTRIAN BRIDGE LINKING BURGOS AND TAG-ANONGAN BOTH OF CORTES, SURIGAO DEL SUR23NH0036 · ₱39,184,537.30 · mapped
- WIDENING OF STO. NIÑO BRIDGE 2 ( B01120MN ) ALONG KAPALONG- TALAINGOD-VALENCIA ( BUKIDNONO ) ROAD INCL. RROW, DAVAO DEL NORTE18LC0017 · ₱37,120,000.00 · mapped
- REHAB./RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE ALONG SURIGAO DEL SUR-BRDY. DAVAO ORIENTAL COASTAL ROAD K1519+066 TO K1520+000, K1527+445 TO K1527+725, BOSTON, DAVAO ORIENTAL18LF0014 · ₱32,204,667.98 · mapped
- CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, TWELVE (12) CLASSROOM BUILDING @ NUEVO ILOCO NHS, MAWAB, COMPOSTELA VALLEY PROVINCE17LA0338 · ₱29,116,685.00 · mapped
- CONSTRUCTION OF 4 STOREY 16 CLASSROOM SCHOOL BUILDING AT TAGUM NATIONAL COMPREHENSIVE HIGH SCHOOL, TAGUM CITY, DAVAO DEL NORTE16LC0098 · ₱26,291,463.07
- WIDENING OF MACO BRIDGE (B00208MN) INCLUDING APPROACHES ALONG SURIGAO-DAVAO COASTAL ROAD, COMPOSTELA VALLEY PROVINCE17LA0038 · ₱23,696,375.58 · mapped
- TANGLAW BRIDGE 3 (B00186MN) ALONG TAGUM-PANABO CIRCUMFERENTIAL ROAD20LC0155 · ₱22,979,875.72 · mapped
- CONSTRUCTION OF CONCRETE ROAD JCT. TAGUM CITY BY PASS ROAD- SAN AGUSTIN NEW BOHOL, NEW CORELLA LEADING TO MATIN-AO INLAND RESORT, NEW CORELLA, DAVAO DEL NORTE19LC0056 · ₱21,559,996.06 · mapped
- CONSTRUCTION OF ROAD - MATIN-AO ROAD LEADING TO BURAKO AND CASILAK FALLS,BRGY. NEW CORTEZ, NEW CORELLA, DAVAO DEL NORTE19LC0059 · ₱19,600,000.00 · mapped
- CONSTRUCTION OF HALL OF JUSTICE (PHASE 1), NABUNTURAN, COMPOSTELA VALLEY PROVINCE18LA0226 · ₱19,600,000.00 · mapped
- CONCRETING OF MAINIT ROAD LEADING TO MAINIT HOTSPRING OF MAINIT PROTECTED LANDSCAPE, BRGY. MAINIT, NABUNTURAN, COMPOSTELA VALLEY PROVINCE18LA0032 · ₱19,205,690.14 · mapped
- ROAD UPGRADING (GRAVEL TO PAVED) ALONG ASUNCION-SAN ISIDRO-LAAK-VERUELA ROAD, KIOKMAY SECTION, LAAK, COMPOSTELA VALLEY PROVINCE17LA0029 · ₱18,960,963.27 · mapped
- CONSTRUCTION OF CONCRETE ROAD SAN MIGUEL ROAD LEADING TO JERRIENOR INLAND RESORT,BRGY.SAN MIGUEL,TAGUM CITY,DAVAO DEL NORTE19LC0065 · ₱16,193,208.57 · mapped
- WIDENING OF BINUANGAN BRIDGE (B00207MN) INCLUDING APPROACHES ALONG SURIGAO-DAVAO COASTAL ROAD, COMPOSTELA VALLEY PROVINCE17LA0030 · ₱16,169,928.43 · mapped
- CONSTRUCTION OF 3 STY - 6 CL SCHOOL BUILDING AT SUAYBAGUIO RIÑA ES, TAGUM CITY, DAVAO DEL NORTE17LC0379 · ₱16,131,746.20 · mapped
- CONCRETING OF BRGY. PAMACAUN FMR PHASE II, BRGY. PAMACAUN, ASUNCION, DAVAO DEL NORTE24LC0088 · ₱14,924,981.79 · mapped
- CONCRETING OF BRGY. KIPALILI FMR, BRGY. KIPALILI, SAN ISIDRO, DAVAO DEL NORTE25LC0064 · ₱14,915,000.00 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, SIX (6) CLASSROOM BUILDING @ MAWAB CES, MAWAB, COMPOSTELA VALLEY PROVINCE17LA0350 · ₱13,802,640.00 · mapped
- CONCRETING OF BRGY. STO. NIÑO FMR, TALAINGOD, DAVAO DEL NORTE21LC0237 · ₱12,934,928.93 · mapped
- CONSTRUCTION OF TWO (2) UNITS, UNIQUE TECHNICAL AND VOCATIONAL FACILITIES/WORKSHOP BUILDING AT:CW1. ANDILI NHS, MAWABCONSTRUCTION OF ONE (1) UNIT, UNIQUE TECHNICAL AND VOCATIONAL FACILITIES/WORKSHOP BUILDING AT:CW2. LORENZO S. SARMIENTO NHS, MAWAB17LA0233 · ₱12,116,115.00 · mapped
- CONCRETING OF BRGY. PALMA GIL FMR, BRGY. PALMA GIL, TALAINGOD, DAVAO DEL NORTE23LC0075 · ₱11,940,000.00 · mapped
- CONCRETING OF BRGY. GUPITAN FMR, KAPALONG, DAVAO DEL NORTE21LC0229 · ₱11,939,999.12 · mapped
- CONCRETING OF BRGY. POBLACION TO BRGY. NEW BOHOL FMR, BRGY. POBLACION AND BRGY. NEW BOHOL, NEW CORELLA, DAVAO DEL NORTE20LC0169 · ₱11,760,895.35 · mapped
- CONSTRUCTION OF ONE (1) UNIT, TWO (2) STOREY, FOUR (4) CLASSROOM @ ANDILI ES, MAWAB, COMPOSTELA VALLEY PROVINCE17LA0389 · ₱10,802,715.00 · mapped
- CONSTRUCTION OF 1 UNIT 1 STOREY 4 CLASSROOM SCHOOL BUILDING AT SALAYSAY, QUEZON, BUKIDNON19KB0142 · ₱10,585,827.11 · mapped
- ROAD WIDENING (4 INTO 6 LANES) INCLUDING DRAINAGE AND RROW ALONG DAANG MAHARLIKA, BANKEROHAN NORTE SECTION, MONTEVISTA, COMPOSTELA VALLEY PROVINCE18LA0024 · ₱10,489,643.13 · mapped
- CONCRETING OF BRGY. SAN AGUSTIN TO BRGY. MAGDUM FMR, BRGY. SAN AGUSTIN AND BRGY. MAGDUM, TAGUM CITY, DAVAO DEL NORTE20LC0179 · ₱9,950,000.00 · mapped
- MATIN-AO LEADING TO BURAKO AND CASILAK FALLS, BRGY. NEW CORTEZ, NEW CORELLA, DAVAO DEL NORTE20LC0027 · ₱9,799,268.19 · mapped
- SANTO TOMAS (TIBAL-OG HIGHWAY) - SANTO TOMAS (BALAGUNAN ROAD) CONNECTING PANABO WHARF TO BANANA INDUSTRIES AND RICE INDUSTRIES21LC0075 · ₱9,603,966.67 · mapped
- LA FILIPINA ROAD-SITIO SAN ISIDRO ROAD - NUEVA FUERZA ROAD - BACA, NEW CORELLA ROAD CONNECTING TAGUM CITY DIVERSION ROAD TO SHARED SERVICE FACILITIES, CACAO INDUSTRIES AND COCONUT INDUSTRIES, TAGUM CITY, DAVAO DEL NORTE20LC0031 · ₱9,505,889.52 · mapped
- CONSTRUCTION OF 2 STY - 4 CL SCHOOL BUILDING (SCIENCE LABORATORY) AT SOUTHERN DAVAO NHS, CITY OF PANABO, DAVAO DEL NORTE17LC0520 · ₱9,439,896.34 · mapped
- CONSTRUCTION OF 2 STY - 4 CL SCHOOL BUILDING (COMPUTER (ICT) LAB) AT SOUTHERN DAVAO NHS, CITY OF PANABO, DAVAO DEL NORTE17LC0519 · ₱8,901,172.25 · mapped
- CONCRETING OF BRGY. TAGBAROS TO BRGY. GUBATAN FMR, MACO, COMPOSTELA VALLEY16LA0154 · ₱8,899,164.24 · mapped
- CONSTRUCTION OF ONE (1) UNIT, UNIQUE TECHNICAL AND VOCATIONAL FACILITIES/WORKSHOP BUILDING AT:CW1. ELIZALDE NHS, MACO CW2. NEW LEYTE NHS, MACOCOMPOSTELA VALLEY PROVINCE17LA0265 · ₱8,469,439.02 · mapped
- CONSTRUCTION OF 2 UNITS, 1 STY - 3 CL SCHOOL BUILDING WITH TOILET, KAUYONAN ES, KAUYONAN, KITAOTAO, BUKIDNON18KB0149 · ₱8,358,258.21 · mapped
- CONSTRUCTION OF NABUNTURAN BARANGAY HALL, BARANGAY POBLACION, NABUNTURAN, COMPOSTELA VALLEY PROVINCE18LA0313 · ₱7,840,000.00 · mapped
- JCT. TAGUM CITY BYPASS ROAD - SAN AGUSTIN - NEW BOHOL, NEW CORELLA, LEADING TO MATIN-AO INLAND RESORT, NEW CORELLA, DAVAO DEL NORTE20LC0152 · ₱7,809,990.26 · mapped
- CONSTRUCTION OF 1STY3CL SCHOOL BUILDING WITH TOILET ATTACHED AT SAMPAO IS, STO. TOMAS, DAVAO DEL NORTE20LC0167 · ₱7,499,870.99 · mapped
- CONSTRUCTION OF MPB 10TH DIVISION, PHIL ARMY, TUBURAN, MAWAB, COMPOSTELA VALLEY PROVINCE19LA0500 · ₱6,860,000.00 · mapped
- CONSTRUCTION OF MPB (BRGY. HALL) PANORAON, MACO, DAVAO DE ORO21LA0173 · ₱6,859,758.52 · mapped
- COMPLETION OF MPB IN MUNICIPALITIES OF LAAK AND COMPOSTELA, COMPOSTELA VALLEY PROVINCE16LA0132 · ₱6,740,315.54 · mapped
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT:CW1. NUEVO ILOCO ES, MAWABCW2. SALVACION ES, MAWABCOMPOSTELA VALLEY PROVINCE17LA0244 · ₱6,215,764.23 · mapped
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT:CW1.TABONTABON ES, MAWABCW2. TUBORAN ES, MAWABCOMPOSTELA VALLEY PROVINCE17LA0215 · ₱6,110,897.93 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (BRGY. HALL) LINDA, NABUNTURAN COMPOSTELA VALLEY PROVINCE20LA0222 · ₱5,880,000.00 · mapped
- CONSTRUCTION OF 1 STY 3 CL SCHOOL BUILDING WITH TOILET ATTACHED AT MAMANGAN ES,SAN ISIDRO,DAVAO DEL NORTE18LC0201 · ₱5,773,487.50 · mapped
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, FOUR (4) CLASSROOM BUILDING AT GUISOK PS, MAWAB, COMPOSTELA VALLEY PROVINCE17LA0212 · ₱5,520,260.00 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →